Most Yate homes have a concrete slab downstairs and chipboard on joists upstairs, and CLA Developments builds wet rooms on both, often in bungalows or for someone avoiding the stairs. BS37 water is hard, so drains and screens are picked to stay clear. Wet rooms are the planned work we travel for. Free site visit and written quote.
“Extremely pleased with this company, came out in the evening and fixed the problem which was not as straightforward as it seemed.”Checkatrade review, GL12. More reviews
How the whole room is built depends on the floor, which is why wet room installers in Yate look at it first. Most post-war houses and bungalows in BS37 have a concrete slab on the ground floor and timber or chipboard joists upstairs, and the two need different approaches to get a level-access shower that drains properly. CLA Developments plans the drainage, tanks the room, lays the falls and tiles it in one team, and a wet room is the kind of larger job we take on this far from our base. The survey is free and the quote is in writing.
Building a wet room on a Yate concrete floor
Downstairs wet rooms are popular in Yate bungalows and in houses where someone needs to avoid the stairs. On a concrete slab, the waste has to run below the finished floor to the drain. That means cutting a channel in the slab or screed for the pipe and setting the drain low enough to give a fall across the shower area.
We usually lay a sloped screed or a preformed tray former, then tank the whole floor and the lower walls with a membrane system, with sealing tape at every corner and pipe entry. Before tiling we flood-test the floor. On a slab there is no flex, so the main risks are a poor fall or a leak at the drain, which is why we take time over both.
In homes in low-lying parts of Yate covered by the River Frome flood warning, it is worth asking whether a ground-floor floor drain needs an anti-flood valve, so water cannot come back up the pipe in a flood.
Upstairs wet rooms over Yate's chipboard and joists
Upstairs in most 1960s to 80s houses around Stanshawes and the Ridge, the floor is chipboard on timber joists, and the bathroom is small with the soil stack in one corner. The waste runs between joists, so the direction they span matters. If they run towards the stack, a linear drain at the wall is often straightforward. If they run across, we may need to notch within safe limits or use a shallow drain. We lift a board at survey to check.
We replace the chipboard in the wet area with exterior-grade ply or a wet room board, fixed at close centres so the floor is stiff. Homes in North Yate and Brimsham Park, built in the 1990s and 2000s, may have engineered joists, which must not be notched at all, so the drain position has to work around them.
If you are deciding between a full wet room and a low-profile tray, our wet room or walk-in shower guide sets out the trade-offs.
Before we build a wet room in Yate
Tell us whether the room is on a concrete ground floor or over chipboard and joists
Check the direction of the joists upstairs if you can lift a board, as it sets the drain position
In a Brimsham Park home, find out whether the floor has engineered joists, which cannot be notched
Locate the soil stack and where it leaves the house
Check the flood map if a downstairs wet room is planned near the River Frome
Tell us who will use the room, so we can plan grab rails, a seat and level access
What tiles suit a Yate wet room with hard water?
Slip-resistant tiles sized to the fall, with as few awkward grout lines as possible. Smaller tiles follow a fall more easily, so mosaics or 300 mm tiles suit a centre drain. Large-format tiles work well with a linear drain, where the floor slopes in one direction only. We use slip-resistant porcelain for the floor and can carry the same tile up the walls. Our floor tiling in Yate covers more on preparation.
Yate water is hard, so glass screens and grout show limescale quickly. A fixed screen with fewer edges, a squeegee after use and an epoxy or high-performance grout all help. Photos of wet rooms we have built, including a slate-effect room with an electric shower, are in our gallery.
Hard water leaves scale on shower heads, screens, taps and boiler heat exchangers. For a wet room in Yate we choose fittings that are easy to descale and recommend scale protection where it genuinely helps.
The town
Yate grew from a small village into a town from the 1950s onwards, and in the 1960s it was designated a development area, with a large retail shopping area and new housing estates.2
Older streets, steep or narrow access and parking all affect how a wet room is planned in Yate, so we look at access at the survey and build it into the timing and the written quote.
South Gloucestershire Council is the planning authority for Yate. We tell you early whether a wet room needs planning permission or building regulations approval, and who to apply to.
Word-for-word Checkatrade reviews from our nearest jobs to Yate, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Fixing a leaky toilet
Had a problem in a new house with a leaky toilet in the week before Christmas. Extremely pleased with this company, came out in the evening and fixed the problem which was not as straightforward as it seemed. Very reasonable rate for the job. Highly recommend.
GL12, Wotton-under-EdgeDecember 2024
replacement of underground supply pipe
very prompt response and good communication. would recommend them
GL12, Wotton-under-EdgeAugust 2026
Walk in shower bathroom refit
Alistair has completed a fantastic job on our bathroom refit removed old bath shower and tiles refitted walk in rainfall shower tray and screen we would highly recommend his work carried out to a high standard.
Very pleased with Alistair. Nice chap, good communication and work completed quickly and on time. Very good quality job, would definitely recommend to others.
Tiling around a bath, fitting new shower, tap and shower screenGL2February 2025
Following a leak from the toilet area in the cloakroom, Alastair assessed the situation and dealt with the problem. It is finished and he left it clean and tidy. Very pleased with the work he has done and I would thoroughly recommend him.
Leak in the cloakroomGL3February 2025
Prompt initial response, followed by inspection visit, quote and confirmed installation date. All handled excellently. Very smart plumber fitted the tap and was very polite and helpful.
New tap fitting in bathroomGL4February 2025
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Usually, yes. Bungalows have a concrete floor in most cases, so we cut a channel for the waste and lay a sloped screed or former to the drain. We check where the drain run can go at survey, and whether the room is big enough to keep the rest of the bathroom dry.
A level-access wet room is the easiest option to use with a shower chair or a walking frame, as there is no tray lip to step over. We can add grab rails, a fold-down seat and a thermostatic valve that limits the water temperature. Tell us at survey who will use the room.
Not if it is built properly. Chipboard upstairs floors, common in BS37's post-war houses, swell and break up if they get wet, so we overboard or replace them with a moisture-resistant board before the membrane goes on. The whole floor and lower walls are then tanked, every joint is taped, and the floor is flood-tested before tiling. Leaks usually come from a poor fall or a badly sealed drain.
Usually, but the drain must be planned around them. Homes built in the 1990s and 2000s at North Yate and Brimsham Park may have engineered timber joists, which must not be notched or cut beyond the maker's rules. We use a shallow drain or position the drain so the waste runs between joists, and check at survey before quoting.
The floor is the main factor. On a concrete slab the waste must run below the finished floor, which means cutting a channel to the drain. Upstairs, chipboard on joists needs replacing with a stiff deck, and engineered joists in newer North Yate homes cannot be notched. Small 1960s to 80s bathrooms may suit a walk-in tray better. Hard water makes an easy-clean drain worthwhile. After a free site visit, we give you a clear written quote.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. Whether it is a dripping tap, a cold radiator or a new bathroom, we will look at the job and tell you plainly what it needs.