Ground floor stripped out and opened up front to back, with a bare concrete floor and plasterboard walls

Groundworks contractors in Gloucestershire

Excavation, foundations, slabs, drainage trenches and bases for extensions, new builds and patios.

Listed on Checkatrade Member of the Association of Master Tradesmen Registered company 16784817 (opens in a new tab) Email photos of the job for a quote

The short answer

Groundworks contractors in Gloucestershire: CLA Developments carries out the excavation, foundations, floor slabs and drainage trenches that everything above depends on, for extensions, new builds and patios. We dig to your engineer's design and work with building control at each inspection. Every job starts with a free site visit and a written quote.

“We highly recommend these guys - they did everything we needed & were a pleasure to deal with.” Checkatrade review, GL5. More reviews

CLA Developments carries out groundworks in Gloucester and across Gloucestershire: excavation, trench fill and strip foundations, floor slabs, drainage trenches and bases for extensions, new builds and patios. It is the part of a build nobody sees once it is finished, and the part that decides whether the walls above crack, settle or stay put. We dig to your engineer's design, work with building control at every inspection, and tell you straight away if the ground is not what the drawings expected. Because the same team goes on to build the walls, lay the drains and finish the inside, the base is set out for what follows rather than handed over and forgotten.

Groundworks we carry out for homeowners

Most of our groundworks are the first stage of a bigger job for a homeowner: the foundations and slab for a single-storey extension, the base for a garden room, the trenches for a new drainage run or the dig and sub-base for a patio. We also take on the groundworks for whole new houses built from a customer's drawings.

We do not offer bulk earthmoving, road building or driveways. Our work is sized for domestic plots, from a terraced back yard dug by hand to a rural site with room for a digger.

  • Excavation and setting out for extensions and new builds
  • Trench fill and strip foundations to the engineer's design
  • Ground-bearing floor slabs with membrane and insulation
  • Drainage trenches for foul and surface water runs
  • Bases for patios, paths, garden rooms and outbuildings
  • Retaining walls and stepped foundations on sloping plots
A long narrow trench dug through gravel hardstanding, with a mini digger, wheelbarrows and spoil
Trenches dug and backfilled properly.

Ground conditions across Gloucestershire

The county changes a lot over a short distance, and the ground decides the depth and type of foundation. In the Severn Vale around Gloucester and much of Cheltenham, heavy Lias clay shrinks in dry summers and swells in wet winters, so foundations need to go below the zone that moves, and deeper still near trees. On the Cotswold edge the ground is stonier and often easier to dig, but springs and wet patches turn up on the valley sides around Stroud.

Floodplains are another matter. Low-lying land along the Severn and Avon, as at Tewkesbury, brings river gravels, a high water table and questions about floor levels that are best answered before the design is fixed. Our groundworks in Tewkesbury start with those questions.

West of the Severn, the Forest of Dean has a long history of coal and iron mining, and old workings lie under parts of it. A mining report is often advised there before foundations are designed, and our Forest of Dean groundworks allow for what an open trench might show. In older towns such as Cirencester, archaeology beneath the ground can also affect when and how you dig, so check any planning conditions.

Before your groundworks survey

  • Gather the drawings, engineer's calculations and any planning conditions
  • Find any ground investigation or mining report for the plot
  • Mark where you think drains, chambers and underground services run
  • Note trees and large shrubs within a few metres of the dig
  • Check access for a small digger, a skip and concrete deliveries
  • Tell your neighbours if the work is near a shared wall or boundary

Trench fill or strip foundations: which do you need?

Most domestic jobs use trench fill, and the engineer decides where the ground calls for something different. A narrow trench is dug to firm ground and filled with concrete almost to the surface, and the walls start on top. It is quick, needs little working space in the trench and suits most clay and mixed ground.

Strip foundations use a wider, shallower band of concrete at the bottom of the trench, with blockwork built up from it to ground level. They use less concrete in deep or wide trenches and are often specified where the trench has to step down a slope.

Where the ground is poor, very deep or affected by old workings, made ground or large trees, a structural engineer may design a reinforced raft, piles or a beam and block floor instead. We build to the engineer's details exactly. If the trench shows something unexpected, such as soft pockets, old fill or water seeping in, we stop and call the engineer before any concrete arrives.

A trench along a driveway filled with fresh tarmac, with workers in hi-vis at the far end
Ground made good once the work is in.

Slabs, bases and drainage trenches

Once the foundations are in, the walls are built up to damp-proof course and the floor goes in. A ground-bearing slab is laid on compacted hardcore with sand blinding, a damp-proof membrane and insulation, and the levels have to tie in with the house so there is no step at the new doorway. Pipes and ducts that pass through the slab go in first.

Drainage trenches are dug in the same phase while the machine is on site. Each run is set to a steady fall, bedded in pea gravel and backfilled with care so it does not settle, with access at every bend and junction. Our drainage service covers the pipework itself, including connections for new bathrooms and extensions.

Patio and path bases need a different sort of care: enough dig-out for a compacted sub-base, a finished level below the damp-proof course where the paving meets the house, and a fall away from the walls. Get that right and the stone or porcelain on top stays flat; our patio and terrace work picks up from the prepared base.

Planning a dig: access, services, spoil and neighbours

Before any digging, we locate what is already in the ground. Gas, water, electric and telecom services, existing drains and inspection chambers all need finding and marking, and some need protecting or diverting. A shared or public sewer under the footprint needs the water company's agreement before you build over or near it.

Spoil is the cost people forget. Even a modest extension fills several skips, and a road-side skip usually needs a permit. On plots with no rear access, trenches are dug by hand or with a small machine, and the spoil goes out through a protected route in the house.

Digging within set distances of a neighbour's foundations can bring the Party Wall Act into play, and notice needs serving in good time. Talk to your neighbours early; it makes the noisy weeks easier for everyone.

Building control and what follows the groundworks

Almost all foundations and new drainage are covered by building regulations. Building control inspects the open trenches before concrete goes in, checks the drainage and looks at the slab before it is covered. Keep the completion certificate, as you will need it when you sell.

Groundworks rarely stand alone. They lead into the walls, roof and finish of an extension, and our house extension building takes the job from the first trench to the last tile. For a whole house built from your drawings, see our new build service.

Planning an extension, new build or patio anywhere in Gloucestershire, from the Severn Vale to steep plots around Stroud? Arrange a free survey and send any drawings, and we will give you a clear written quote and a realistic schedule.

Free quote

Free quote for groundworks across Gloucestershire

  • We reply within one working day, Monday to Friday, 9am to 5pm.
  • A free, no-obligation site visit.
  • A clear written quote before any work starts.

Prefer to talk it through? Call 07858 305739.

Tell us about the job

Two details and we'll call you back.

Enter your name

Enter a phone number we can call

No obligation. Prefer to talk? Call 07858 305739, Monday to Friday, 9am to 5pm.

We only use your details to reply about this job. Privacy.

Grey porcelain patio being laid, wet, with a hose, tools and a box of clips
Real work, real customers

What our customers say about our building work

Alistair did a fantastic job. He was courteous and efficient. Left the job in a tidy state. Reasonably priced. Would highly recommend.

Fitting a new stopcockGL4July 2025

We highly recommend these guys - they did everything we needed & were a pleasure to deal with. Perfect - thank you!

Perfect plumbers!GL5January 2026

Alistair came out on a Friday night to fix a leak in my kitchen. He was professional and thorough in the midst of the emergency situation. Realising the previous plumber and kitchen fitter had done a very poor job, I then asked him to fix the nightmare situation for me which he did. The kitchen has been fine ever since. He is polite and timely and always clears up. I am very grateful to him and wouldn't hesitate to recommend his service.

Excellent help in an emergencyGL5January 2026

The boys helped us out after we had been let down by a different plumber. Really nice lads, very easy to get on with. Work carried out without any issues.

Fantastic ServiceGL14January 2026

CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.

How we work

Four steps from first call to finished job

The same process whether it's a new tap or a full extension, so you always know what happens next.

  1. 01

    On-site survey

    We come out, look at the job properly and talk through what you want, including any drawings you already have.

  2. 02

    Clear quote

    A written quote with the work, the price and a realistic schedule. No obligation and no surprises later.

  3. 03

    Design & layout

    We agree the layout, materials and finishes with you before anything is ordered or removed.

  4. 04

    Installation & work

    One team carries out the work, keeps the site tidy and checks everything with you at the end.

Checkatrade

Reviewed on Checkatrade

Every review on this site comes from a real customer.

Association of Master Tradesmen

Master Tradesmen

Members of the Association of Master Tradesmen.

Qualified tradespeople

Fully qualified, with years of hands-on experience on every job.

Guaranteed work

Guarantees on materials and workmanship.

FAQ

Groundworks: your questions answered

Can't see yours? Call or email and you'll speak to the people doing the work.

Trench fill means filling a narrow trench with concrete almost to ground level, with the walls built straight on top. Strip foundations use a wider, thinner band of concrete at the bottom, with blockwork built up from it. Trench fill is quicker; strip foundations can save concrete in deep or wide trenches. The engineer and building control decide which suits your ground.

There is no single answer. Depth depends on the soil, nearby trees, drains and the engineer's design, and on clay it is usually deeper than on stony ground. Building control inspects the trench and can ask for more depth if the ground is poor. A trial pit before work gives a good early idea.

A patio base on its own does not normally need building control approval. A garden room may, depending on its size, use and position, and building regulations can apply even when planning permission does not. Check with your local building control team or the Planning Portal before ordering the building.

We stop work in that area and call the engineer. Soft ground, old fill, a forgotten drain, mine workings or water coming into the trench can all change the foundation design. Building control has to agree any change. It may add time or cost, and we will explain both before carrying on.

Yes. On terraces and tight plots we dig by hand or with a small machine that fits through a gate or doorway. Spoil goes out in bags and concrete may be barrowed or pumped in. It is slower, and we build that into the written schedule after seeing the access.

Foundation depth and type come first, and they depend on the ground conditions and nearby trees, which building control will inspect. The amount of spoil to remove, access for machines and lorries, drains that have to be diverted and anything unexpected in the ground, such as old foundations or soft spots, all add work. Your engineer's design sets the specification. We give a clear written quote after a free site visit.

Both. Most of our groundworks lead into an extension, new build or patio that we then build. We also prepare foundations and bases for customers who have their own builder, and the quote states exactly where our work stops.

Free quotes & advice

Get a no-obligation quote and straight answers about your project. We're happy to help you plan a build or renovation so it runs efficiently.

Book a site visit
Prefer to talk it through?07858 305739

Lines open Monday to Friday, 9am to 5pm

Connect with us 07858 305739 CLADevelopmentsltd@gmail.com Checkatrade reviews (opens in a new tab) Get in touch