Groundwater in the glacial gravel, not rock, is what slows a trench in Moreton-in-Marsh. CLA Developments takes on groundworks here as part of larger planned jobs such as extensions and new homes, with a pump on site and pours timed around the weather. Ask for a free site visit and a written quote.
“We are very pleased with the end result.”Checkatrade review, GL3. More reviews
Mudstone and alluvial silt sit under most of the town, which is why groundworks in Moreton-in-Marsh need more care with water than with rock. The Charmouth Mudstone of the upper Evenlode valley is a Lias clay that holds water, moves with the seasons and drains slowly, and the alluvium in places is softer still. We dig and pour foundations for extensions and new builds, cast slabs, cut drainage trenches and build bases for patios, paths and garden rooms, with spoil taken away and the site kept tidy. Groundworks for a larger build are the kind of work we take on further afield, and we plan them around the weather and the ground.
Boulder clay, gravel and mudstone under Moreton
Moreton sits on flat ground at about 400 feet in the Vale of Moreton. The top few metres are usually boulder clay, a stiff glacial clay with stones in it, over beds of glacial sand and gravel and then Charmouth Mudstone, with soft alluvium along the streams. The town's early wells were sunk through the clay into that gravel, which tells you water sits in it. A trench can go from firm clay to wet gravel within a metre.
On the clay, trench fill is the usual choice: a narrow trench taken below the zone that dries and swells, filled with concrete close to ground level. Where the dig hits soft alluvium or made ground, or trees are close, the engineer may want deeper trench fill, a reinforced raft or piles. Building control inspects the open trench and agrees the depth before any concrete goes in, and we tell you straight away if the ground is not what was expected.
Dewatering trenches near the Evenlode and the old town
Where a trench breaks into the gravel, groundwater can come in faster than rain ever would, especially in winter. We keep a pump on site, dig and pour in short lengths, clean out softened clay at the base and never pour into standing water or onto frozen ground. The lowest ground, around St David's Church where the old town grew up and along the streams that feed the Evenlode, is where this happens most.
After the July 2007 flood, when around 260 homes and premises in the town were flooded, some plots carry planning conditions on floor levels or surface water. Moreton also has Iron Age and Roman finds, and some consents near the Fosse Way carry an archaeology condition. Check your consent before we set out, because a raised floor level or a watching brief changes the programme.
Excavation and spoil removal by skip or grab lorry
Trench fill and strip foundations
Ground-bearing slabs with membrane and insulation
Drainage trenches laid to fall
Bases for patios, paths and garden buildings
Before we dig foundations in Moreton-in-Marsh
Check the planning consent for floor level, flood or archaeology conditions
Look up the plot on the government flood map, especially on the lower ground
Ask whether a soil report or trial pit exists, as clay can turn to gravel within a metre
Mark trees within about 20 metres of the dig, as they change the depth on clay
Find drains and services before excavation, including any old shared runs
Agree where the skip or grab lorry stands, and avoid the High Street on market day
How do you get a digger into a Moreton garden?
We plan the route at the survey, because older houses in the centre can have tight rear access, so how the digger gets in and the spoil gets out has to be planned. Clay bulks up once dug, so there is always more of it than people expect. We agree skip or grab lorry positions at the survey, including anything that needs a permit on the road.
The A429 through the town is the Fosse Way and the main route north and south, so a grab lorry or skip on the High Street needs planning, and Tuesday market day is best avoided for deliveries.
Planning an extension, new home or garden base in Moreton-in-Marsh? Send us your drawings and we will arrange a free site visit. Call 07858 305739.
Free quote
Free quote for groundworks in Moreton-in-Marsh
We reply within one working day, Monday to Friday, 9am to 5pm.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL56
Council
Cotswold District Council
County
Gloucestershire
Typical homes
Stone High Street on the Fosse Way, brick terraces, council estates
Our cover
Larger jobs; call us about urgent work
Local conditions
What affects groundworks in Moreton-in-Marsh
The things about Moreton-in-Marsh homes and ground that change how we plan and price this job, and what each one means for you.
Ground
Flat ground at about 400 ft, with the town on glacial gravel and the rest of the parish on boulder clay, with alluvial soil and a narrow belt of Lower Lias beside the streams.1
Soil type and water in the ground decide dig depth, trench support and how spoil is handled, so we plan the dig around what the site actually holds.
The town
North Cotswold market town strung along the wide High Street of the Fosse Way (A429), laid out by Westminster Abbey in the 13th century, with a station on the Cotswold Line and the Fire Service College on the former RAF airfield.2
Older streets, steep or narrow access and parking all affect how groundworks is planned in Moreton-in-Marsh, so we look at access at the survey and build it into the timing and the written quote.
Typical homes
Stone High Street on the Fosse Way, brick terraces, council estates.1
Older and newer homes hide different things behind walls and under floors, so we plan groundworks in Moreton-in-Marsh around the house you have, not a standard job.
Cotswold District Council is the planning authority for Moreton-in-Marsh. We tell you early whether your job needs planning permission or building regulations approval, and who to apply to.
We don't have a Checkatrade review from GL56 yet. These are word for word from our jobs across Gloucestershire, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Kitchen Floor Tiling
Alistair did a great job on the floor. We needed a screed down to give a good surface so it was a little more complex than normal. But even so it was all done on one evening and the next day.
GL54January 2025
Bathroom fitting
We used AJH Plumbing and Heating to remove and install two bathrooms. They turned up when they said they would and despite challenges and needing to change materials part way through they worked really hard. We are very pleased with the end result.
GL3, GloucesterJuly 2026
Pleased with the Finished Result
Happy with the job. The shower tray needed replacing and there was some uncertainty about possible water damage underneath, but everything was explained clearly before the work went ahead. The work was completed to a good standard, within excellent time, and the new shower is super sturdy. Thank you
Great service, Alistair was friendly and pleasant and the job was completed to a high standard.
Heating and plumbingGL50January 2026
The boys helped us out after we had been let down by a different plumber. Really nice lads, very easy to get on with. Work carried out without any issues.
Fantastic ServiceGL14January 2026
We highly recommend these guys - they did everything we needed & were a pleasure to deal with. Perfect - thank you!
Distances are straight-line from Moreton-in-Marsh.
Where we work
Groundworks across Moreton-in-Marsh
We cover Moreton-in-Marsh (GL56) and the villages around it, including Stow-on-the-Wold, Bourton-on-the-Water and Chipping Campden. Larger jobs; call us about urgent work.
Deep enough to sit below the seasonal movement of the clay, and deeper if trees are nearby or the ground is soft. Building control agrees the final depth when they inspect the open trench. Where the ground is poor, an engineer may design deeper or piled foundations, and we build to that design.
Yes, with care. On Moreton's clay, trenches can fill with rainwater, so we pump them out, remove any softened base and pour promptly once the depth is approved. Heavy rain or hard frost can move a pour by a day or two, and we keep you informed.
Yes. A garden room needs a level, well-drained base, usually a concrete slab or a compacted sub-base with slabs, depending on the building. On clay we dig out to a firm formation first. Tell us the size and the make of the building, and we will price the right base.
Probably because it reached the glacial sand and gravel under the boulder clay. Water sits in that layer, which is why the town's old wells were sunk into it. We pump the trench, clean out any softened base, and pour in short lengths. Building control may want to see the base again before concrete goes in.
Water is the main variable. Where a trench breaks into the glacial sand and gravel under the boulder clay, groundwater comes in quickly, so pumping and removing softened clay add time. Foundations go below seasonal movement, deeper near trees, and soft alluvium by the streams can need an engineer's design. Spoil bulks up once dug, and a skip or grab lorry on the High Street may need a permit. We price all of this into a clear written quote after a free site visit.