For a floor tiler in Moreton-in-Marsh, damp comes first: parts of the town flooded in July 2007, and stone cottages near the High Street often have solid floors laid straight on the ground. CLA Developments checks for damp before choosing tile or a breathable floor. Larger planned rooms suit us best this far out. Site visit and quote come free.
“Very helpful, efficient and friendly company who completed the job over the weekend to fit in with our plans.”Checkatrade review, GL3. More reviews
Old solid floors in Cotswold cottages are the trickiest base for floor tiling in Moreton-in-Marsh. Many were laid straight onto the ground with no damp-proof membrane, and moisture moves up through them. Seal them under impermeable tiles and adhesive and that moisture may move into the walls or lift the tiles. Timber floors need overboarding, and new screeds must be dry. We prepare each floor to suit, then lay hallways, kitchens, bathrooms and shop floors in herringbone, hexagon, patterned and wood-effect porcelain, with natural stone where it suits the house.
Old solid floors in stone cottages
Before tiling an old solid floor, we check how damp it is and what it is made of. Sometimes the right answer is to dig it out and lay a new insulated floor with a membrane, or a breathable limecrete slab. Sometimes a breathable stone floor laid in lime is better than porcelain. We explain the options at the survey.
In a listed building, lifting original floors may need consent, so check with Cotswold District Council first. If you are also adding heating, see underfloor heating in Moreton, because the floor and heating should be planned together.
The oldest part of Moreton, around St David's Church, sits on ground the old records describe as marshy and liable to flood, so solid floors there can be damper than the same floor on higher ground. Those are the floors where a breathable finish is most often the right call.
How are boarded floors in Moreton's brick terraces prepared for tile?
They are stiffened and overboarded first. The brick terraces along the Evenlode and Chipping Norton roads, and the council houses from Wellington Road to Stockwells, mostly have suspended softwood floors that have been lifted for wiring and pipes many times. We screw down loose boards, check the joists, overboard with ply or backer board and lay a decoupling membrane before tiling, so movement in the timber does not crack the tiles. Ground floors that took water in 2007 get a closer look at the joist ends.
In the homes built east and south of the town in recent years, the base is usually a screed or a concrete slab. New screeds in extensions must be dry before tiling, which can take weeks, so we test rather than guess. Large-format tiles go down with levelling clips so the edges sit flush.
Before floor tiling in Moreton-in-Marsh
Tell us if the house is listed or in the High Street conservation area before old floors come up
Lift a board so we can see the joists in an older terrace or council house
On an old solid floor near St David's Church, expect a damp test first
Find the date a new screed was laid on an extension or new estate home
For a shop, give us opening hours and avoid Tuesday market day for the noisy work
Check door heights, as new boards and tiles raise the floor
Shop floors along Moreton's market street
Moreton's High Street has been a market street since Westminster Abbey laid out the town in the 13th century, and the weekly Tuesday market still fills it. Shops, cafés and inns in the stone buildings along it need hard-wearing, slip-resistant floors laid with as little disruption as possible. We plan around opening hours, avoid market day for deliveries, and use rapid-setting adhesive and grout where the floor has to be back in use quickly.
Planning a new floor in a Moreton-in-Marsh home or shop? Tell us about the room and the floor underneath, and we will arrange a free survey. Call 07858 305739.
Free quote
Free quote for floor tiling in Moreton-in-Marsh
We reply within one working day, Monday to Friday, 9am to 5pm.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL56
Council
Cotswold District Council
County
Gloucestershire
Typical homes
Stone High Street on the Fosse Way, brick terraces, council estates
Our cover
Larger jobs; call us about urgent work
Local conditions
What affects floor tiling in Moreton-in-Marsh
The things about Moreton-in-Marsh homes and ground that change how we plan and price this job, and what each one means for you.
Building materials
Stone or stone-faced buildings on the High Street, the larger houses mostly 18th-century ashlar.1
We match or work with the materials your house is actually built from, so the new work sits right with the original fabric and stays sound.
The town
North Cotswold market town strung along the wide High Street of the Fosse Way (A429), laid out by Westminster Abbey in the 13th century, with a station on the Cotswold Line and the Fire Service College on the former RAF airfield.2
Older streets, steep or narrow access and parking all affect how floor tiling is planned in Moreton-in-Marsh, so we look at access at the survey and build it into the timing and the written quote.
Typical homes
Stone High Street on the Fosse Way, brick terraces, council estates.1
Older and newer homes hide different things behind walls and under floors, so we plan floor tiling in Moreton-in-Marsh around the house you have, not a standard job.
We don't have a Checkatrade review from GL56 yet. These are word for word from our jobs across Gloucestershire, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Kitchen Floor Tiling
Alistair did a great job on the floor. We needed a screed down to give a good surface so it was a little more complex than normal. But even so it was all done on one evening and the next day.
GL54January 2025
Floor tiling
Had approx 8m2 of floor tiles installed, hallway and downstairs bathroom. Job included removal and refitting of vanity unit and back to wall toilet and the install of a new heated towel rail. Very helpful, efficient and friendly company who completed the job over the weekend to fit in with our plans. Would definitely recommend.
GL3, GloucesterOctober 2025
Tiling around a bath, fitting new shower, tap and shower screen
Very pleased with Alistair. Nice chap, good communication and work completed quickly and on time. Very good quality job, would definitely recommend to others.
Alistair did a fantastic job of fitting a very snazzy new bathroom and WC room. He did some excellent tiling and did some extra plumbing work for us too. He worked very very hard and we were impressed with his work ethic. thank you
New bathroom and WC room.GL5June 2025
Alistair has completed a fantastic job on our bathroom refit removed old bath shower and tiles refitted walk in rainfall shower tray and screen we would highly recommend his work carried out to a high standard.
Walk in shower bathroom refitGL12May 2025
recently had my bathroom completely updated, including a new bath, shower installation, and tiling work, and I couldn’t be happier with the results. From start to finish, the service was professional, reliable, and of a very high standard. Everything was clearly explained before the work began, and the attention to detail throughout the project really stood out. The tiling in particular is neat and precise, and the overall finish has completely transformed the space. The work was completed on time, with minimal disruption, and everything was left clean and tidy at the end of each day.
BathroomupgradeGL4April 2026
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Distances are straight-line from Moreton-in-Marsh.
Where we work
Floor tiling across Moreton-in-Marsh
We cover Moreton-in-Marsh (GL56) and the villages around it, including Stow-on-the-Wold, Bourton-on-the-Water and Chipping Campden. Larger jobs; call us about urgent work.
Sometimes, but it depends on how damp the floor is and how it was built. Sealing an old floor with no membrane can push moisture into the walls or lift the tiles. We check the floor first and explain whether to tile over, lay a breathable finish or dig out and start again.
Often, by working in sections or outside opening hours. Tiles and adhesive need time to set before foot traffic, so we plan the sequence with you. We agree a schedule in the written quote before we start.
Natural stone, terracotta-look and stone-effect porcelain all suit cottage kitchens. Porcelain is harder-wearing and easier to clean; natural stone looks softer but needs sealing. We can bring samples to the survey so you can see them in the room.
Only once we know what is underneath. Timber floors that sat in water may have soft joist ends, and solid floors can still hold moisture if the original repair sealed it in. We lift a board or test the slab first, put right anything that has failed, then choose a base and adhesive to suit.
For a Moreton floor, the base and the risk of water matter most. Old cottage floors laid on the ground may need digging out for an insulated floor with a membrane, or a breathable limecrete slab, which is a much bigger job than tiling over. Terrace floorboards lifted many times need fixing and overboarding. Shop floors planned around opening hours and market day may need rapid-set materials. Distance means bigger jobs suit us best. You get a clear written quote after a free site visit.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. We will help you choose tiles that suit the room and plan the layout before anything is fixed.