New build builders in Moreton-in-Marsh

Building a new home in Moreton or a nearby village from approved drawings, from clay foundations to a stone shell and a finished house.

Listed on Checkatrade Member of the Association of Master Tradesmen Registered company 16784817 (opens in a new tab) Email photos of the job for a quote

The short answer

Working as new build builders in Moreton-in-Marsh, CLA Developments brings a full team up the Fosse Way and runs the build in planned blocks, since a whole house is the larger kind of job we travel for. Foundations go into boulder clay over wet glacial gravel. A free site visit and clear written quote come first.

“At every step he made sure we were happy with the plans and discussed fully the options when changes needed to be made.” Checkatrade review, GL12. More reviews

Drawings approved, plot cleared and a planning consent full of conditions about stone, roofing and windows: that is where most new builds in Moreton-in-Marsh start. The historic centre has been a conservation area since 1970 and the land to the west of the town is largely in the Cotswolds National Landscape, so consents there often set the walling stone, the roof covering and the detailing. Under it all, the boulder clay and mudstone of the Vale of Moreton set the foundations. We build homes from your drawings, from groundworks through the structure to a watertight shell, or on to a turnkey finish. We do not design, so you will need an architect or designer.

Stone, brick or reconstituted stone: what Moreton consents ask for

Which side of town the plot is on matters. West of the town, inside the National Landscape, and within the conservation area around the High Street, a new house is usually expected to read as Cotswold limestone, with natural stone walling, a stone slate or matching roof and sample panels approved before work starts. Much of the land to the east is outside the National Landscape, and the estates built there in recent years use reconstituted stone and brick, so a consent on that side may allow the same.

Either way, a stone-faced cavity wall is built with a blockwork inner leaf, insulation and a stone outer leaf tied back to it, with the coursing set out to match the drawings. We get sample panels built early, because a delay in sign-off holds up the whole programme.

Walls lined with insulation boards, with the door and window openings taped in red and sheeted in plastic

Foundations, drainage and floor levels on Evenlode clay

Moreton stands on boulder clay over glacial sand and gravel and Charmouth Mudstone, with soft alluvium by the streams. The clay moves with the seasons and drains slowly, and the gravel underneath holds water. Foundations go down to the depth building control agrees on the day, deeper near trees, and the engineer may specify a raft or piles where the ground is poor. The digging is explained in more detail under Moreton groundworks.

The town flooded badly on 20 July 2007, when around 260 homes and premises took water, and plots on lower ground may carry conditions on floor levels or surface water. Rainwater from a new roof cannot simply go to a soakaway in heavy clay without a passing test, so plan the route early; see drainage in Moreton-in-Marsh.

  • Foundations, slab and below-ground drainage
  • Blockwork inner leaf and stone or brick outer leaf
  • Roof structure and covering to a watertight shell
  • Plumbing, heating, plaster, floors and tiling for turnkey

Before building a new home in Moreton-in-Marsh

  • Check whether the plot is in the conservation area or the National Landscape west of the town
  • List every pre-commencement condition, such as stone samples, levels and drainage
  • Look up the plot on the government flood map and check any floor level condition
  • Get a site investigation, as boulder clay can give way to wet gravel or alluvium
  • Confirm surface water and foul connections before groundworks are priced
  • Agree lorry access and storage, avoiding the High Street on market day

Can you finish a new Moreton-in-Marsh home turnkey?

Yes, or we can stop at a watertight shell. Some owners take the house to a watertight shell and finish it with their own trades; others want one team to carry on. Moreton is at the far edge of our area, so for a turnkey build we plan the trades in blocks: first fix plumbing and heating, plaster and screeds, then kitchens, bathrooms, floors, tiling and joinery, each run as a continuous stretch rather than odd days. The hand-over point and the order of works go into the written quote.

Deliveries come in along the A429 and A44, which meet in the town, so we plan lorry access and avoid the High Street on Tuesday market day. Planning sits with Cotswold District Council, and building control inspects at set stages before signing the house off. We build new homes elsewhere in the Cotswolds as well, including new builds in Cirencester. Our process for new build homes is set out separately, and we also bring other trades to Moreton-in-Marsh.

New stair and floor junction boxed in with timber during a renovation

Got consent and drawings for a new home in or near Moreton-in-Marsh? Send them over and we will visit the plot for a free survey. Call 07858 305739.

Free quote

Free quote for a new build in Moreton-in-Marsh

  • We reply within one working day, Monday to Friday, 9am to 5pm.
  • A free, no-obligation site visit.
  • A clear written quote before any work starts.

Prefer to talk it through? Call 07858 305739.

Tell us about the job

Two details and we'll call you back.

Enter your name

Enter a phone number we can call

No obligation. Prefer to talk? Call 07858 305739, Monday to Friday, 9am to 5pm.

We only use your details to reply about this job. Privacy.

Postcodes
GL56
Council
Cotswold District Council
County
Gloucestershire
Typical homes
Stone High Street on the Fosse Way, brick terraces, council estates
Our cover
Larger jobs; call us about urgent work
Local conditions

What affects a new build in Moreton-in-Marsh

The things about Moreton-in-Marsh homes and ground that change how we plan and price this job, and what each one means for you.

Ground

Flat ground at about 400 ft, with the town on glacial gravel and the rest of the parish on boulder clay, with alluvial soil and a narrow belt of Lower Lias beside the streams.1

The ground sets the foundation design and drainage strategy for a new home, so we work from the engineer's and building control's requirements from day one.

Building materials

Stone or stone-faced buildings on the High Street, the larger houses mostly 18th-century ashlar.1

We match or work with the materials your house is actually built from, so the new work sits right with the original fabric and stays sound.

The town

North Cotswold market town strung along the wide High Street of the Fosse Way (A429), laid out by Westminster Abbey in the 13th century, with a station on the Cotswold Line and the Fire Service College on the former RAF airfield.2

Older streets, steep or narrow access and parking all affect how a new build is planned in Moreton-in-Marsh, so we look at access at the survey and build it into the timing and the written quote.

Planning authority

Cotswold District Council.3

Cotswold District Council is the planning authority for Moreton-in-Marsh. We tell you early whether your job needs planning permission or building regulations approval, and who to apply to.

Checkatrade reviews

What our customers say

We don't have a Checkatrade review from GL56 yet. These are word for word from our jobs across Gloucestershire, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.

  • Kitchen Floor Tiling

    Alistair did a great job on the floor. We needed a screed down to give a good surface so it was a little more complex than normal. But even so it was all done on one evening and the next day.

    GL54January 2025
  • Full bathroom refurbishment

    Alistair provided a very good and full service, plumbing, tiling and fitting. At every step he made sure we were happy with the plans and discussed fully the options when changes needed to be made. I recommend him without hesitation.

    GL12, Wotton-under-EdgeMay 2025
  • Fixing a leaky toilet

    Had a problem in a new house with a leaky toilet in the week before Christmas. Extremely pleased with this company, came out in the evening and fixed the problem which was not as straightforward as it seemed. Very reasonable rate for the job. Highly recommend.

    GL12, Wotton-under-EdgeDecember 2024

Read more reviews See them on Checkatrade (opens in a new tab)

Beamed room with walls lined in insulation boards, plastic sheeting and a tub of mixed plaster
Real work, real customers

More Checkatrade reviews of our work

Good work

Fix leaking cisternGL2February 2025

Absolutely perfect. Great communication up front and the whole job was done less than 24 hours later. Couldn't have asked for any better!

Kitchen tap replacementGL6February 2025

Alistair was efficient and tidy and did the work nicely. He worked hard to fix a new kitchen tap.

Kitchen Tap fixingGL52February 2025

CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.

Where we work

New builds across Moreton-in-Marsh

We cover Moreton-in-Marsh (GL56) and the villages around it, including Stow-on-the-Wold, Bourton-on-the-Water and Chipping Campden. Larger jobs; call us about urgent work.

    Open in Google Maps (opens in a new tab)
    FAQ

    New builds in Moreton-in-Marsh: questions answered

    Can't see yours? Call or email and you'll speak to the people doing the work.

    Not always, but the planning consent will say. In the conservation area and the wider Cotswolds National Landscape, natural or reconstituted Cotswold stone is often required, with matching mortar and roof covering. Check the conditions on your approval and with Cotswold District Council. We price to whatever the consent sets.

    Yes. We price from your drawings, the engineer's calculations and the planning conditions, visit the plot, and send a written quote with a realistic schedule. If the ground or the site differs from what was drawn, we raise it with you and your designer before going further.

    It depends on the size, the specification and the weather, and stone walling takes longer than brick or render. Getting to a watertight shell is usually the first milestone, followed by the internal fit-out. We give you a realistic programme in the quote and update it if anything changes on site.

    It can be. Cotswold District Council notes that the land west of the town is largely in the Cotswolds National Landscape, while much of the land around the rest of Moreton is not. That can change what materials and design are acceptable. Your consent and its conditions are what count, so read them before we price the walling.

    The consent, the ground and the distance. Natural stone walling and the roofing that conditions specify for the conservation area, or for land to the west in the National Landscape, are a large part of the materials. Boulder clay over glacial gravel can need deeper foundations and pumping, and floor levels may need raising on low ground. Being at the edge of our area, we schedule the trades in continuous blocks to keep travel down. A free site visit gives you a clear written quote.

    Free quotes & advice

    Get a no-obligation quote and straight answers about your project. We're happy to help you plan a build or renovation so it runs efficiently.

    Book a site visit
    Prefer to talk it through?07858 305739

    Lines open Monday to Friday, 9am to 5pm

    Connect with us 07858 305739 CLADevelopmentsltd@gmail.com Checkatrade reviews (opens in a new tab) Get in touch