In Moreton-in-Marsh, rendering is usually about rubble gables, rear ranges and outbuildings behind the High Street's dressed stone. CLA Developments re-renders them in breathable lime, takes off damp-trapping cement and plans larger jobs around the trip north. A no-cost visit to the gables comes first, then a quote on paper.
“Alastair was very helpful & was neat and tidy when work was carried out - would recommend”Checkatrade review, GL4. More reviews
Rubble stone gables, rear walls and outbuildings are where most rendering in Moreton-in-Marsh is needed. Good dressed Cotswold limestone fronts were rarely meant to be covered, but rougher rubble walls often were, in lime and limewash, and many were later patched or recoated in cement. That hard cement coat cracks, lets rain in and then traps it, so the wall inside stays damp and the stone behind starts to decay. We apply lime render to stone and cottage walls, repair and patch existing render, and remove cement where it is causing damp. If a wall needs a specialist proprietary system, we will tell you so.
Why does cement render cause damp in Moreton stone walls?
Limestone walls built in lime mortar were designed to take in a little rain and let it dry out again. Cement render is far harder and less breathable than the stone, so as the wall moves it cracks along the joints, water runs in, and it cannot escape. You see it inside as damp patches, blown plaster and salts, often low on a gable or behind a downpipe.
Taking it off has to be done gently. Cement can bond hard to soft limestone and pull the face away with it, so we test a small panel first, then remove it in sections and let the wall dry before any new lime goes on.
Rubble walls behind the High Street and in the old town
The fronts on Moreton's High Street are mostly dressed stone or stone-faced, and some, like the mid-18th-century house called The Steps, are fine ashlar that was never meant to be covered. The render work is round the back: rubble rear ranges, outbuildings and gable ends, and the older cottages near St David's Church, where the first settlement stood on damp, low ground. Those walls take driven rain across the open, flat country around the town.
We rake out loose joints, dampen the wall, then render in coats: a first coat worked into the stone, a straightening coat, and a floated finish that follows the wall. Each coat is kept damp and protected from frost while it cures, which on this exposed ground means planning lime work between spring and early autumn. Limewash on top gives the soft, chalky finish that suits these walls and is simple to renew. A thatched cottage gable we re-rendered is among the photos in our past jobs.
Lime render on rubble stone gables and rear walls
Outbuildings, garden walls and chimney stacks
Blown or cracked render cut back and patched
Limewash or breathable mineral paint finishes
Before lime rendering in Moreton-in-Marsh
Check if the wall is listed or in the conservation area before changing its finish
Find out whether the existing render is lime or cement, with a small test patch
Look inside for damp, salts or blown plaster behind the rendered wall
Clear gutters and downpipes on the elevation first
Plan the work between spring and early autumn, away from frost on the open ground
Agree the limewash colour against the neighbouring stone
Consent, inside walls and related work
Much of Moreton's centre is a conservation area, and many buildings are listed. Changing a wall's finish, removing render or rendering bare stone can need consent, so check with Cotswold District Council before work is booked. Like-for-like repairs to existing lime render are usually simpler.
The conservation area was designated in 1970. Brick houses from the 1870s onwards, such as the Oddfellows terraces on the Evenlode road, were built to be seen as brick, so we would usually suggest repointing rather than rendering them.
Cracked or damp render on a stone wall in Moreton-in-Marsh? Send us a few photos and we will arrange a free survey. Call 07858 305739.
Free quote
Free quote for rendering in Moreton-in-Marsh
We reply within one working day, Monday to Friday, 9am to 5pm.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL56
Council
Cotswold District Council
County
Gloucestershire
Typical homes
Stone High Street on the Fosse Way, brick terraces, council estates
Our cover
Larger jobs; call us about urgent work
Local conditions
What affects rendering in Moreton-in-Marsh
The things about Moreton-in-Marsh homes and ground that change how we plan and price this job, and what each one means for you.
Building materials
Stone or stone-faced buildings on the High Street, the larger houses mostly 18th-century ashlar.1
We match or work with the materials your house is actually built from, so the new work sits right with the original fabric and stays sound.
The town
North Cotswold market town strung along the wide High Street of the Fosse Way (A429), laid out by Westminster Abbey in the 13th century, with a station on the Cotswold Line and the Fire Service College on the former RAF airfield.2
Older streets, steep or narrow access and parking all affect how rendering is planned in Moreton-in-Marsh, so we look at access at the survey and build it into the timing and the written quote.
Typical homes
Stone High Street on the Fosse Way, brick terraces, council estates.1
Older and newer homes hide different things behind walls and under floors, so we plan rendering in Moreton-in-Marsh around the house you have, not a standard job.
Cotswold District Council is the planning authority for Moreton-in-Marsh. We tell you early whether your job needs planning permission or building regulations approval, and who to apply to.
We don't have a Checkatrade review from GL56 yet. These are word for word from our jobs across Gloucestershire, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Kitchen Floor Tiling
Alistair did a great job on the floor. We needed a screed down to give a good surface so it was a little more complex than normal. But even so it was all done on one evening and the next day.
GL54January 2025
Good Service
Alastair was very helpful & was neat and tidy when work was carried out - would recommend 👍
GL4, GloucesterOctober 2025
Fitting a new stopcock
Alistair did a fantastic job. He was courteous and efficient. Left the job in a tidy state. Reasonably priced. Would highly recommend.
Was able to repair quickly, when further issues developed came straight back and sorted. Left area clean, no parts left behind. Friendly, polite and professional.
Alistair fixed our staff toilet in the office and did a great job, everything was left very clean and tidy, and he was very efficient. Would highly recommend!
Would highly recommend!GL52July 2025
This is the second job Alastair has done for me, and once again I'm really pleased with his work. He replaced a leaking outdoor tap that another plumber had said was too much hassle—but for Alastair, it was straightforward and he sorted it with no fuss. The old pipe had been leaking into my limestone walls and the tap didn’t work. Now everything's fixed, no more leaks, and the tap works perfectly. Would definitely recommend.
Fixed broken outdoor tapGL6August 2025
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Distances are straight-line from Moreton-in-Marsh.
Where we work
Rendering across Moreton-in-Marsh
We cover Moreton-in-Marsh (GL56) and the villages around it, including Stow-on-the-Wold, Bourton-on-the-Water and Chipping Campden. Larger jobs; call us about urgent work.
It depends on the wall. Good dressed stone fronts were usually left bare, while rough rubble walls, gables and outbuildings were often limewashed or rendered in lime. If the wall was rendered originally, a new lime render is a sound choice. Cement render on stone almost always causes problems.
Most often because the render is cement and has cracked. Rain gets in through the cracks but cannot dry back out through the hard surface, so it works its way through the stone into the room. Taking off the failed render and re-rendering in lime usually lets the wall dry out over the following months.
Usually every few years, depending on how exposed the wall is. Walls facing the prevailing weather wear faster. Limewash is cheap and quick to reapply, and keeping it up protects the render underneath. We can show you how to look after it between visits.
We would usually advise against it. The Oddfellows terraces and early council houses were built as brick and are meant to be seen that way. Damp in solid brick usually comes from failed pointing, high ground outside or a leak, so we look at those first. Repointing in a suitable mortar is often the better fix.
Mostly how much cement must come off and the access to the wall. Rear ranges and outbuildings behind the High Street can be reached only through yards or carriage arches, which affects scaffold. Gables on open, flat ground take driving rain, so lime needs protecting while it cures. In the conservation area or on a listed building, a change of finish may need consent from Cotswold District Council. Limewash adds coats. Travel is factored into smaller jobs. We give a clear written quote after a free site visit.
Free quotes & advice