
Bathroom fitters across Gloucestershire
Full bathroom refits, en-suites and WC rooms. Plumbed, boarded, tanked and tiled by one team from strip-out to final clean.
Listed on Checkatrade Member of the Association of Master Tradesmen Registered company 16784817 (opens in a new tab) Email photos of the job for a quote
A bathroom fitter strips out the old room, then plans, plumbs, boards, tiles and finishes the new one. CLA Developments fits bathrooms, en-suites and WC rooms across Gloucestershire with one team, so the plumbing, any building work and the tiling happen in the right order. Every refit starts with a free site visit and a written quote.
“Alistair did a great job refitting and tiling a bathroom for us.” Checkatrade review, GL52. More reviews
If you are looking for bathroom fitters in Gloucester who will handle the whole job, CLA Developments plans, strips out, plumbs, boards, tiles and finishes bathrooms, en-suites and separate WC rooms with one team. We work across Gloucestershire, from Gloucester and Cheltenham to Stroud and the Cotswold towns. Most people come to us with a bathroom that leaks, looks tired or no longer suits the household. We start with a survey, give you a written quote with a realistic schedule, and agree every material and finish before anything is ordered or removed.
Planning a bathroom refit
Good planning starts with what cannot easily move. The soil stack, the joist direction and the route the waste pipes can take decide where the toilet and shower can sensibly go. Moving a toilet to the far side of the room is possible, but it may mean raising the floor, boxing in pipework or running a new connection to the stack.
At the survey we look at water pressure and your hot water source, because that decides whether a mixer shower, a pumped shower or an electric shower is right. We also check ventilation, since a bathroom without a working extractor soon grows mould on new grout. Lighting, fans and shaver points fall under bathroom zone rules and must be done by a qualified electrician, so we fix their positions with you at the planning stage.
Then we agree the layout, the suite, the tiles, the trims and the grout colour in writing. Some items have long lead times, so ordering happens once everything is agreed, not halfway through the strip-out.

Strip-out and first-fix plumbing
We isolate the water and protect floors and stairs before anything comes out. Old tiles, the suite, boxing and often the plaster or boarding behind come off, so we can see the walls, floor and pipework properly. This is where hidden problems show up: rotten joists under an old bath, lead or poorly jointed pipework, or a waste with no fall.
First fix is everything that will disappear behind walls and floors. We run new supplies and wastes, fit concealed valves and cisterns, add noggins for basins, rails and screens, and pressure-test the pipework before it is covered. Getting this stage right is what stops a new bathroom leaking two years later.
Before your bathroom survey
- Decide whether you want a bath, a shower or both
- Note anything that annoys you about the current room
- Collect photos or links of tiles and fittings you like
- Check how your hot water is heated
- Think about who will use the room in ten years
- Plan where the household will wash while the room is out of use
Boarding and tanking
Plasterboard and old plaster are fine for dry walls but not inside a shower. In wet zones we use cement-based or waterproof boards, screwed at the right centres so they do not flex under tile. Floors on timber joists are overboarded with exterior-grade ply or tile backer board so the tiles have a stiff base.
Around showers and baths we tank the walls and floor with a waterproofing membrane, using reinforcing tape in the corners and collars around pipes and valves. For level-access showers this extends across the whole floor, which our wet room installation page explains in detail.

Tiling done in-house
Because our own team does the tiling, there is no gap between the plumber leaving and a tiler turning up. We set out from the centre of the main wall so cuts are even at both ends, use levelling clips on large-format tiles and leave the right movement joints at corners and floor junctions.
A customer in GL52 said Alistair "did a great job refitting and tiling a bathroom for us" and that "the job was completed on time". Another in GL5 mentioned "excellent tiling" on a new bathroom and WC room. Our wall tiling work covers metro, large-format, patterned and marble-effect tiles, niches and feature walls.
Second fix, checks and handover
Second fix is when the room comes together. We fit the basin, toilet, taps, shower valve and screen, hang the towel rail and connect the wastes. Then we fill and test everything, check the shower runs to the drain without ponding, and seal the joints that need flexible sealant rather than grout.
Before we finish, we walk round the room with you, run every tap and flush, and show you where the isolation valves are. The site is cleaned and the rubbish taken away. A customer in GL4 summed up what we aim for: "Great bathroom install and great communication."
How long does a bathroom refit take?
How long a bathroom refit takes depends on the size of the room, how much the layout changes and what we find once the old bathroom is out. A like-for-like swap in a sound room is quicker than moving the toilet, tanking a level-access shower or repairing joists. Your written quote sets out a realistic schedule for your job.
The order is always the same, and knowing it helps you plan when the bathroom will be out of use.
- Strip-out and inspection of walls, floor and pipework
- Repairs to joists, floors or walls if needed
- First-fix plumbing and pressure test
- Boarding, tanking and drying time for membranes and adhesives
- Wall and floor tiling, then grouting
- Second fix, testing, sealing and handover
Bathroom refit in Stroud, Cheltenham and the Cotswolds
Every area brings different rooms. A bathroom refit in Stroud often means steep-sided terraces with uneven stone walls and floors that need packing level. As bathroom fitters in Cheltenham we regularly work in tall Regency rooms with long pipe runs, and we fit plenty of bathrooms in Cheltenham's period townhouses as well as newer homes.
Small WC rooms and en-suites need the same care in a tighter space. Wall-hung pans and concealed cisterns save floor area, and an en-suite in a converted bedroom may need a new waste route to the stack. One customer in Wotton-under-Edge had us remove the "old bath, shower and tiles" and fit a "walk-in rainfall shower tray and screen". We also carry out bathroom installation across Gloucestershire, including homes around Gloucester and Quedgeley.
If you are planning a new bathroom, en-suite or WC room, book a free bathroom survey and we will give you a clear written quote with a realistic schedule.
Free quote for a bathroom refit across Gloucestershire
- We reply within one working day, Monday to Friday, 9am to 5pm.
- A free, no-obligation site visit.
- A clear written quote before any work starts.
Prefer to talk it through? Call 07858 305739.
Tell us about the job
Two details and we'll call you back.
That didn't send, sorry. Please try again, or call 07858 305739.

What customers say about our bathroom fitters
Alistair did a great job refitting and tiling a bathroom for us. The job was completed on time and Alistair even managed to fit in some additional small plumbing jobs which was really helpful. Alistair is straightforward and easy to work with.
Great bathroom install and great communication
Alistair did a fantastic job of fitting a very snazzy new bathroom and WC room. He did some excellent tiling and did some extra plumbing work for us too. He worked very very hard and we were impressed with his work ethic. thank you
Alistair has completed a fantastic job on our bathroom refit removed old bath shower and tiles refitted walk in rainfall shower tray and screen we would highly recommend his work carried out to a high standard.
Allistar has done an amazing job for my dad’s bathroom, turning it into a shower. He was reliable, professional and did a great job! Would recommend any day :) Thank you
Alistair did a fantastic job. He was courteous and efficient. Left the job in a tidy state. Reasonably priced. Would highly recommend.
Had approx 8m2 of floor tiles installed, hallway and downstairs bathroom. Job included removal and refitting of vanity unit and back to wall toilet and the install of a new heated towel rail. Very helpful, efficient and friendly company who completed the job over the weekend to fit in with our plans. Would definitely recommend.
I am very happy with the work that Alistair did for me. He came within one day of me contacting him. I highly recommended him to anyone who needs a reliable and competent plumber. I will definitely use him again in the future.
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Guides about bathroom fitters
Straight answers from the people doing the work, written for homes in Gloucestershire.
Bathroom fitters in every town we cover
Pick your town for local detail on bathroom fitters there: the housing, what to expect and how quickly we can reach you.
Gloucestershire
- Bathroom fitters in Gloucester
- Bathroom fitters in Cheltenham
- Bathroom fitters in Stroud
- Bathroom fitters in Cirencester
- Bathroom fitters in Tewkesbury
- Bathroom fitters in Nailsworth
- Bathroom fitters in Wotton-under-Edge
- Bathroom fitters in Forest of Dean
- Bathroom fitters in Bishop's Cleeve
- Bathroom fitters in Dursley
- Bathroom fitters in Tetbury
- Bathroom fitters in Cinderford
- Bathroom fitters in Coleford
- Bathroom fitters in Moreton-in-Marsh
Worcestershire
South Gloucestershire
Wiltshire
Four steps from first call to finished job
The same process whether it's a new tap or a full extension, so you always know what happens next.
- 01
On-site survey
We come out, look at the job properly and talk through what you want, including any drawings you already have.
- 02
Clear quote
A written quote with the work, the price and a realistic schedule. No obligation and no surprises later.
- 03
Design & layout
We agree the layout, materials and finishes with you before anything is ordered or removed.
- 04
Installation & work
One team carries out the work, keeps the site tidy and checks everything with you at the end.

Reviewed on Checkatrade
Every review on this site comes from a real customer.

Master Tradesmen
Members of the Association of Master Tradesmen.
Qualified tradespeople
Fully qualified, with years of hands-on experience on every job.
Guaranteed work
Guarantees on materials and workmanship.
Bathroom fitters: your questions answered
Can't see yours? Call or email and you'll speak to the people doing the work.
Yes. Our own team does the plumbing, boarding, tanking and tiling, so there is no waiting between trades. It also means one team is responsible for the whole room. We tile walls and floors in ceramic, porcelain and natural stone, including large-format and patterned tiles.
It depends on the size of the room, how much the layout changes and what we find under the old bathroom. A like-for-like refit in a sound room is quicker than moving the toilet or tanking a level-access shower. Your written quote includes a realistic schedule, and we keep you updated if anything changes.
Usually, yes, but the soil stack and joist direction decide how easily. A toilet needs a waste with enough fall back to the stack, which may mean raising the floor or boxing pipework. We look at this at the survey and tell you honestly whether the move is worth the extra work.
Yes. We fit en-suites, downstairs cloakrooms and separate WC rooms as well as main bathrooms. In small rooms wall-hung pans, concealed cisterns and compact basins make the most of the space. An en-suite in a converted bedroom may need a new waste route, which we plan at the survey.
The size of the room and whether the layout changes matter most, especially moving a toilet and its soil pipe. The suite, tiles and brassware you choose, the area to be tiled and whether walls need boarding or tanking all count. Joists or floors found damaged once the old bathroom is out add work, and a level-access shower needs the floor tanked and laid to falls. We give a clear written quote after a free site visit.
Yes. Strip-out and removal of the old suite, tiles and boarding is part of the job, and we keep the site tidy as we go. If you want to keep anything, such as a cast iron bath or a vanity unit, tell us before we start and we will take it out carefully and set it aside.
Yes. We guarantee our materials and workmanship. Before we finish, we test every tap, flush and waste with you and show you where the isolation valves are. If anything is not right afterwards, contact us and we will come back to look at it.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. Whether it is a dripping tap, a cold radiator or a new bathroom, we will look at the job and tell you plainly what it needs.
Book a site visitLines open Monday to Friday, 9am to 5pm
