As bathroom fitters in Bishop's Cleeve, CLA Developments uses one team for strip-out, plumbing, boarding and tiling. Most rooms we see are original builder's bathrooms in post-war and newer estate houses, while the elm-framed cottages round St Michael's church need gentler handling of old floors. Every job starts with a free site visit and quote.
“Great service at a competitive price on a difficult bathroom job from this firm, highly recommended”Checkatrade review, GL52. More reviews
As bathroom fitters in Bishop's Cleeve, we are mostly asked about family bathrooms that were fitted when the house was built and have not changed since: a bath with a shower over it, a basin on a pedestal and tiles that have seen better days. A customer in GL52 told us "Alistair did a great job refitting and tiling a bathroom for us. The job was completed on time", and added that he fitted in some small plumbing jobs too. That mix is typical. We strip out, replumb, board, tile and finish with one team, starting from a free survey and a written quote with a realistic schedule.
What fits in a small Bishop's Cleeve estate bathroom?
Usually one of three layouts, because most estate bathrooms here only just take a bath, basin and toilet. Keep the bath and improve the shower over it, swap the bath for a large walk-in shower, or rearrange the room to fit a vanity unit and wall-hung toilet. The soil stack position usually sets where the toilet stays.
Boxed-in pipework is common in these houses. When we strip out, we often replace old copper and waste runs while the walls are open, so nothing hidden is left to fail after the new tiles go on.
Strip out of the old suite and tiles
New supply and waste pipework where needed
Moisture-resistant or tile backer boards
Suite, shower, towel rail and extractor
Wall and floor tiling, sealing and final check
Adding an en-suite to a newer home
Many four-bedroom houses in the village were built with one family bathroom and a small en-suite, or none at all. Adding or enlarging an en-suite usually means a new stud wall, a waste route back to the stack and good ventilation. Where the waste cannot fall to the stack, a pumped unit can work, though we always try gravity first.
Newer homes often have engineered timber joists, which must not be notched or drilled except in the places the manufacturer allows. We check the joist type before planning pipe routes, as it changes what is possible.
Where your house sits in the village's growth tells us a lot. Homes from the post-war housing built for workers at the Smiths factory, and the estates added through the 1970s and 1980s, usually have one bathroom over the kitchen with the soil stack on the back wall. Houses on Homelands and Cleevelands, built from 2010 onwards in the north and north-west, more often have an en-suite already, and the request is a better shower or a downstairs WC.
Before we refit a bathroom in Bishop's Cleeve
Work out roughly when the house was built (post-war, 1970s to 1990s, or Homelands and Cleevelands from 2010), as it tells us the joist type
Check whether the soil stack is inside the house or on the back wall, since it fixes where the toilet can go
If you are near St Michael's church, Church Road or Station Road, find out whether the house is listed or in the conservation area
On a house built in the last ten years, check whether the new-home warranty is still running before walls are opened
Look in the loft for a cold water tank, which shows the house is still tank-fed and affects shower choice
Find the stopcock, usually under the kitchen sink in the village's estate houses
Bathrooms in the older houses round St Michael's church
A smaller share of our bathroom enquiries come from the old village centre, around St Michael's church, Church Road and Station Road. Several cottages there are timber-framed, many built of elm and encased in brick from the late 17th century, so floors are rarely level and some walls are lime plaster over framing. We board those walls with care, keep cement-based products off old timber and plan the extractor route through a wall that can take it.
Some of these houses are among the village's 31 listed buildings, and the conservation area designated in 1979 covers the centre. A new vent or soil pipe on a front wall should be checked with Tewkesbury Borough Council before we order anything.
Showers, tiling and finishing
Swapping a bath for a walk-in shower is popular with households who rarely use the bath. For a fully level floor, see our wet room installs in Bishop's Cleeve. Tiling is planned with the plumbing, and our tiling work in the village covers everything from metro to large-format porcelain.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL52
Council
Tewkesbury Borough Council
County
Gloucestershire
Typical homes
Timber-framed and stone village core, post-war and modern estates
Our cover
Regular cover, including urgent call-outs
Local conditions
What affects a bathroom refit in Bishop's Cleeve
The things about Bishop's Cleeve homes and ground that change how we plan and price this job, and what each one means for you.
Water hardness
Bishop's Cleeve's mains water is moderately hard (about 194 mg/l as CaCO3, Severn Trent's Bishops Cleeve supply zone).1
Moderately hard water still builds some scale over time, so we pick valves, screens and heating parts that cope with it and tell you how to keep them clear.
Building materials
Brick in most post-war homes, from the large Cleeve estate of mostly semi-detached brick houses to the brick bungalows and houses of the 1960s.2
Block cavity walls, concrete floors and plasterboard make pipe runs simpler, but we still check for wall ties, insulation and buried services before routing pipework for a bathroom refit in Bishop's Cleeve.
The town
Large village about 4.6 miles from Cheltenham at the foot of Cleeve Hill.3
Older streets, steep or narrow access and parking all affect how a bathroom refit is planned in Bishop's Cleeve, so we look at access at the survey and build it into the timing and the written quote.
Reviews from customers in and around Bishop's Cleeve
Word-for-word Checkatrade reviews from jobs in GL52, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Toilet repair
Great service at a competitive price on a difficult bathroom job from this firm, highly recommended
GL52July 2026
Bathroom refit
Alistair did a great job refitting and tiling a bathroom for us. The job was completed on time and Alistair even managed to fit in some additional small plumbing jobs which was really helpful. Alistair is straightforward and easy to work with.
GL52January 2026
Tiled kitchen floor
Review for Alistair at AJH Plumbing & Heating Solutions. Kitchen Floor Tiling, We couldn’t be more pleased with the job Alistair did on our new kitchen floor. His workmanship is top-notch – precise and clearly carried out with great pride and attention to detail. He was faced with a few unexpected issues once the old flooring came up, but he handled each challenge swiftly and without fuss, offering practical solutions and keeping the project on track. It’s clear he knows his trade inside out. Professional, reliable, and a pleasure to have around – we wouldn’t hesitate to recommend Alistair
Alistair fixed our staff toilet in the office and did a great job, everything was left very clean and tidy, and he was very efficient. Would highly recommend!
Would highly recommend!GL52July 2025
We’d been let down by other tradespeople so were really grateful when Alistair could come round and help us with a small plumbing job. Very friendly and prompt at replying - would certainly recommend
Friendly and prompt serviceGL52July 2025
Alistair was efficient and tidy and did the work nicely. He worked hard to fix a new kitchen tap.
Kitchen Tap fixingGL52February 2025
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Usually, yes. A standard bath space takes a generous shower tray with a fixed glass screen. We reroute the waste, fit a suitable shower valve, board and tile the walls. If it is your only bath, think about resale, though many buyers now prefer a large shower.
Often, yes. We check where the waste can reach the soil stack, the joist type and the ventilation route. In houses still under a new-home warranty, check whether alterations affect your cover before starting work.
A standard family bathroom typically takes around one to two weeks, including tiling. Adding new walls, moving the toilet or replacing pipework adds time. Your written quote includes a realistic schedule, and we agree materials before starting.
Yes, with more planning. Listed building consent can be needed for internal changes, so check with Tewkesbury Borough Council before work is booked. We use breathable materials against old walls, keep new pipe runs clear of original timbers where we can and route extraction to avoid a new hole in the front elevation. Uneven floors in the village's timber-framed cottages are worked with, not forced flat.
Mostly how far the layout moves and what the floor hides. Keeping the toilet near the existing stack in an estate semi keeps the plumbing simple, while adding an en-suite means a stud wall, a new waste route and an extractor. Engineered joists in the newer Homelands and Cleevelands homes limit where pipes can run, and the timber-framed cottages near St Michael's often need floors levelling first. You get a clear written quote once we have made a free site visit.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. Whether it is a dripping tap, a cold radiator or a new bathroom, we will look at the job and tell you plainly what it needs.