Most homeowners in Bishop's Cleeve who want warm floors are building onto a post-war or modern house, and the new slab for that extension is the simplest place to lay pipe. CLA Developments designs and fits wet and electric underfloor heating across the village, and a free site visit and quote is where every job starts.
“Alistair did a great job refitting and tiling a bathroom for us.”Checkatrade review, GL52. More reviews
For many families, underfloor heating in Bishop's Cleeve comes up while planning something bigger: an open-plan kitchen extension, a garage turned into a playroom or a new en-suite. With walls full of units or glazing, radiators have nowhere to go, and a warm floor suits the open-plan rooms these projects create. Most homes in the village have concrete ground floors and chipboard upstairs, which affects the build-up and the finished floor height. We design the system, lay the pipe or mats, connect it to the boiler or heat pump and lay the tiles on top, so the floor is planned as one job.
Extensions and garage conversions in Bishop's Cleeve
In a new extension, underfloor heating goes in with the slab. Insulation boards go down first, then the pipe loops, then the screed. It costs little extra at this stage and saves wall space later. We plan the levels so the new floor meets the existing house without a step.
Garage conversions are trickier, as the existing garage slab is usually lower and uninsulated. We insulate, lay the heating and screed up to match the house floor. Building control will check the floor insulation, so we plan the build-up to meet their requirements.
Garage conversions are common on the 1970s and 1980s estates. Raising the converted floor to the house level also helps keep it dry in a village where surface water flooded around 90 to 100 properties, with Woodmancote and Southam, in July 2007.
Wet systems with a manifold and room thermostats
Electric mats for small bathrooms
Low-profile systems for existing floors
Pressure testing before screeding
Commissioning before tiles are laid
Can you fit underfloor heating without digging up a Bishop's Cleeve floor?
Yes, in most cases: on existing concrete floors in the village, a low-profile overlay system avoids digging up the slab. It raises the floor a little, so we check door clearances and thresholds first. Insulation beneath it is still important, otherwise much of the heat goes into the slab rather than the room.
In en-suites, electric mats under the tiles give warm floors at little floor height. The electrical connection must be made by a qualified electrician, which we arrange as part of the job.
Houses built since 2010 on Homelands and Cleevelands usually have insulated ground floors already, which suits a low-profile system. Older post-war slabs often have little or no insulation, so the build-up has to include it.
Before underfloor heating goes into a Bishop's Cleeve floor
Find out whether the floor is a slab, beam and block, or boards on joists
Check door thresholds and stair nosings for the extra height of an overlay system
In a garage conversion, measure the step down from the house floor
Tell us whether the heat source is a combi, a system boiler or a planned heat pump
In an older or listed cottage, ask the council before an original floor is lifted
Choose the floor finish now, as tile, stone and timber need different settings
Warm floors in the older houses of the village centre
In the timber-framed and stone houses around St Michael's church, floors are either old solid floors, usually without a damp membrane, or boards on joists. Lifting a solid floor to add insulation and heating is a big job, and in one of the village's listed buildings it may need consent.
On boarded floors, pipes can run between the joists on spreader plates with insulation below, which leaves the floor height as it was and suits rooms where the door heads are already low.
Tiles, timber and the heat source
Tile and stone are the best finishes over underfloor heating, as they pass heat well. Our floor tiling in Bishop's Cleeve uses flexible adhesives suited to heated floors. Engineered wood can work too, within the manufacturer's temperature limits. If you are planning an extension, see our extension builders in the village so the heating is designed in from the start.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL52
Council
Tewkesbury Borough Council
County
Gloucestershire
Typical homes
Timber-framed and stone village core, post-war and modern estates
Our cover
Regular cover, including urgent call-outs
Local conditions
What affects underfloor heating in Bishop's Cleeve
The things about Bishop's Cleeve homes and ground that change how we plan and price this job, and what each one means for you.
Water hardness
Bishop's Cleeve's mains water is moderately hard (about 194 mg/l as CaCO3, Severn Trent's Bishops Cleeve supply zone).1
Moderately hard water can still scale a boiler over the years, so we check and protect the system as part of underfloor heating.
Building materials
Brick in most post-war homes, from the large Cleeve estate of mostly semi-detached brick houses to the brick bungalows and houses of the 1960s.2
Block cavity walls, concrete floors and plasterboard make pipe runs simpler, but we still check for wall ties, insulation and buried services before routing pipework for underfloor heating in Bishop's Cleeve.
The town
Large village about 4.6 miles from Cheltenham at the foot of Cleeve Hill.3
Older streets, steep or narrow access and parking all affect how underfloor heating is planned in Bishop's Cleeve, so we look at access at the survey and build it into the timing and the written quote.
Reviews from customers in and around Bishop's Cleeve
Word-for-word Checkatrade reviews from jobs in GL52, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Kitchen Tap fixing
Alistair was efficient and tidy and did the work nicely. He worked hard to fix a new kitchen tap.
GL52February 2025
Toilet repair
Great service at a competitive price on a difficult bathroom job from this firm, highly recommended
GL52July 2026
Bathroom refit
Alistair did a great job refitting and tiling a bathroom for us. The job was completed on time and Alistair even managed to fit in some additional small plumbing jobs which was really helpful. Alistair is straightforward and easy to work with.
Alistair fixed our staff toilet in the office and did a great job, everything was left very clean and tidy, and he was very efficient. Would highly recommend!
Would highly recommend!GL52July 2025
We’d been let down by other tradespeople so were really grateful when Alistair could come round and help us with a small plumbing job. Very friendly and prompt at replying - would certainly recommend
Friendly and prompt serviceGL52July 2025
Review for Alistair at AJH Plumbing & Heating Solutions. Kitchen Floor Tiling, We couldn’t be more pleased with the job Alistair did on our new kitchen floor. His workmanship is top-notch – precise and clearly carried out with great pride and attention to detail. He was faced with a few unexpected issues once the old flooring came up, but he handled each challenge swiftly and without fuss, offering practical solutions and keeping the project on track. It’s clear he knows his trade inside out. Professional, reliable, and a pleasure to have around – we wouldn’t hesitate to recommend Alistair
Tiled kitchen floorGL52May 2025
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Often, yes. The garage slab needs insulating and raising anyway, so adding heating at the same time is efficient. It frees wall space and gives an even warmth. Building control will check the floor insulation, so we plan the build-up to meet their requirements.
A screed system takes a few hours to warm from cold, so it works best on a steady schedule rather than being switched on and off. Low-profile and electric systems respond faster. We set up the controls to suit how you use each room.
Yes. The underfloor heating connects to the heating circuit through a manifold with a mixing valve, which lowers the water temperature. We check the boiler has enough output for the extra area and set up the controls so the floor and radiators work together.
Tile and stone work best because they pass heat quickly. Engineered wood and some vinyls work within the maker's temperature limits. Thick carpet and underlay act as insulation and slow the heat down. We help you choose a finish when we design the system.
Often, but it depends on the floor. Boarded floors in the timber-framed cottages near St Michael's church can take pipes between the joists without raising the level. Old solid floors usually have no damp membrane or insulation, so they need digging out and relaying. In a listed house, check with Tewkesbury Borough Council before any original floor is lifted.
Mostly what the floor is made of now. On a new extension slab over the village's Lias clay, the insulation and screed are part of the build anyway. Overlaying an existing concrete floor on a post-war estate adds boards and some threshold work, while an old cottage floor near St Michael's church may need digging out and a damp membrane first. Room size, zones, the finish and the heat source matter too. We give a clear written quote after a free site visit.