As floor tilers in Bishop's Cleeve, CLA Developments prepares and tiles everything from open-plan kitchens on the concrete slabs of post-war and Homelands homes to upstairs en-suites on chipboard and engineered joists. We cover the whole village, and a free site visit comes first, followed by a written quote with no obligation.
“Alistair did a great job refitting and tiling a bathroom for us.”Checkatrade review, GL52. More reviews
Floor tiling in Bishop's Cleeve usually means one of two jobs. The first is a big open-plan ground floor, often after a knock-through or extension, where the tiles run from the hallway through the kitchen and out to the garden doors. The second is a bathroom or en-suite upstairs, on chipboard or ply over timber joists. Each needs different preparation, and getting the subfloor right is what stops tiles cracking later. We lay large-format, wood-effect, herringbone and patterned porcelain, and natural stone. A customer in Gloucester had "approx 8m2 of floor tiles installed, hallway and downstairs bathroom", a typical job of this kind.
Can you tile a concrete floor in a Bishop's Cleeve estate house?
Yes. Most ground floors in the village are concrete, either a slab or beam and block with a screed. They are a good base for tiles if they are flat, dry and sound. Large-format tiles need a very flat floor, so we check it with a long straight edge and level any dips with a self-levelling compound.
Where a new extension meets the old house, the two floors can move differently. We put a movement joint at that line, often hidden under a doorway, so the tiles do not crack along it.
Extensions on the village's Lower Lias clay usually sit on deeper foundations than the house they join, so a little movement at the line is normal and the joint is there to absorb it.
Large-format porcelain
Wood-effect plank tiles in herringbone or straight lay
Hexagon and patterned tiles
Natural stone
Matching indoor and outdoor tiles
Upstairs floors from post-war joists to engineered I-joists
Upstairs bathroom floors in the village vary with the age of the house. Post-war and 1970s homes usually have solid timber joists under chipboard or old boards, often notched over the years for pipes. Houses built since 2010, on estates such as Homelands and Cleevelands, more often have engineered joists and tongue-and-groove chipboard. We lift a board to see which, because it decides how stiff the floor can be made.
On either, we overboard with ply or tile backer board screwed down at close centres, then lay a decoupling membrane so movement in the timber does not crack tiles or grout. Wet areas are tanked, and for a level-access shower see our wet rooms in Bishop's Cleeve, where the floor is built to fall to a drain.
In the timber-framed cottages near St Michael's church, floors can dip several centimetres across a room. We level with a ply raft or flexible compound rather than forcing a large tile over the dip, and smaller formats such as hexagons follow an old floor better.
Before we tile a floor in Bishop's Cleeve
Lift a corner of the old flooring so we can see whether it is concrete, screed, chipboard or boards
Find out whether upstairs joists are engineered, likely on houses built in the last fifteen years
If the house has been extended, note where the old back wall stood, as the movement joint goes on that line
In an older cottage near St Michael's church, measure how far the floor dips across the room
Allow for doors to be trimmed for the extra height of board, adhesive and tile
Tell us about any underfloor heating, so it is commissioned before tiling
Heated floors and the garden doors
Tiles and underfloor heating work well together. With underfloor heating in Bishop's Cleeve, the system is commissioned and warmed up before tiles go down, and we use flexible adhesive suited to heated floors.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL52
Council
Tewkesbury Borough Council
County
Gloucestershire
Typical homes
Timber-framed and stone village core, post-war and modern estates
Our cover
Regular cover, including urgent call-outs
Local conditions
What affects floor tiling in Bishop's Cleeve
The things about Bishop's Cleeve homes and ground that change how we plan and price this job, and what each one means for you.
Building materials
Brick in most post-war homes, from the large Cleeve estate of mostly semi-detached brick houses to the brick bungalows and houses of the 1960s.1
We match or work with the materials your house is actually built from, so the new work sits right with the original fabric and stays sound.
The town
Large village about 4.6 miles from Cheltenham at the foot of Cleeve Hill.2
Older streets, steep or narrow access and parking all affect how floor tiling is planned in Bishop's Cleeve, so we look at access at the survey and build it into the timing and the written quote.
Typical homes
Timber-framed and stone village core, post-war and modern estates.1
Older and newer homes hide different things behind walls and under floors, so we plan floor tiling in Bishop's Cleeve around the house you have, not a standard job.
Reviews from customers in and around Bishop's Cleeve
Word-for-word Checkatrade reviews from jobs in GL52, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Bathroom refit
Alistair did a great job refitting and tiling a bathroom for us. The job was completed on time and Alistair even managed to fit in some additional small plumbing jobs which was really helpful. Alistair is straightforward and easy to work with.
GL52January 2026
Tiled kitchen floor
Review for Alistair at AJH Plumbing & Heating Solutions. Kitchen Floor Tiling, We couldn’t be more pleased with the job Alistair did on our new kitchen floor. His workmanship is top-notch – precise and clearly carried out with great pride and attention to detail. He was faced with a few unexpected issues once the old flooring came up, but he handled each challenge swiftly and without fuss, offering practical solutions and keeping the project on track. It’s clear he knows his trade inside out. Professional, reliable, and a pleasure to have around – we wouldn’t hesitate to recommend Alistair
GL52May 2025
Toilet repair
Great service at a competitive price on a difficult bathroom job from this firm, highly recommended
Alistair fixed our staff toilet in the office and did a great job, everything was left very clean and tidy, and he was very efficient. Would highly recommend!
Would highly recommend!GL52July 2025
We’d been let down by other tradespeople so were really grateful when Alistair could come round and help us with a small plumbing job. Very friendly and prompt at replying - would certainly recommend
Friendly and prompt serviceGL52July 2025
Alistair was efficient and tidy and did the work nicely. He worked hard to fix a new kitchen tap.
Kitchen Tap fixingGL52February 2025
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Not directly. Chipboard flexes and can swell if it gets wet. We overboard with ply or tile backer board, screwed down at close centres, then lay a decoupling membrane. This gives a stiff, stable surface that will not crack your tiles.
Yes, if laid well. Long planks need a very flat floor and a staggered pattern that avoids lining up joints. A herringbone layout adds interest in larger rooms. We set out the pattern from the main doorway so it looks straight as you walk in.
Usually you can walk on them carefully after 24 hours, once the adhesive has set. Grout needs another day before light use. Heavy furniture and appliances should wait a few days longer, depending on the adhesive and the room temperature.
No, we take it up first. Vinyl, laminate and the underlay beneath them are not a sound base for adhesive, and tiling over them leads to loose and cracked tiles. Once they are lifted we check the floor below, clean off old adhesive and level it before tiling.
Yes, with the right preparation. The timber-framed cottages on Station Road and Church Road often have floors that slope or dip. On boards we fix a ply raft and decoupling membrane; on an old solid floor we check for damp first, as many were laid without a membrane. Smaller tiles and natural stone follow a gentle slope better than large-format porcelain.
Mostly the floor underneath and the size of the room. A concrete slab that only needs self-levelling costs less to prepare than an upstairs en-suite where the chipboard has to be overboarded and stiffened. Open-plan kitchen-diners after a knock-through often need two slabs levelled to match, and large-format or herringbone tiles take longer to set out. Lifting old vinyl or tiles adds time too. After a free site visit you get a clear written quote.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. We will help you choose tiles that suit the room and plan the layout before anything is fixed.