Ground floor stripped out and opened up front to back, with a bare concrete floor and plasterboard walls

Groundworks contractors in the Forest of Dean

Digging, foundations, slabs and bases for Forest extensions, new homes and outbuildings, planned around slopes, old workings and lane access.

Listed on Checkatrade Member of the Association of Master Tradesmen Registered company 16784817 (opens in a new tab) Email photos of the job for a quote

The short answer

CLA Developments handles groundworks in the Forest of Dean regularly, digging excavations and foundations on plots across the district to your engineer's design. Clays in the central coal basin hold water while the limestone rim can hide fissures and scowle workings, so the ground is looked at during a free site visit, before a written quote.

“The bill was reasonable too, and the bathroom left tidy.” Checkatrade review, GL11. More reviews

Digging on a Forest plot rarely goes exactly to plan, and good groundworks in the Forest of Dean allow for that from the start. Slopes, old coal and iron workings, tree roots near woodland edges and access down narrow lanes all shape how the first stage of a build goes. CLA Developments excavates for and pours trench fill and strip foundations, lays slabs, digs drainage trenches and prepares bases for extensions, outbuildings and patios. We work from your engineer's design, keep building control involved at each inspection and tell you straight away if the ground is not what was expected. Every job starts with a free survey.

How do you dig foundations on a sloping Forest plot?

By cutting in and stepping down, because the wooded hills between the Severn and the Wye give many plots a fall, sometimes a steep one. A level extension or base on a slope means cutting into the high side, stepping the foundations down the hill and often holding the cut back with a retaining wall. The engineer sets the step sizes and the wall design.

Spoil is the hidden cost on a rural site. A small extension can produce several skips' worth, and a lane that will not take a grab lorry means it goes out in smaller loads. Some can stay on site to reshape a garden if levels allow, and we agree that before digging starts.

Grey porcelain patio being laid, wet, with a hose, tools and a box of clips

Foundations near old workings and trees

Parts of the district sit over old mine workings, and your engineer or conveyancer may advise a mining report before foundations are designed. If we open a trench and find voids, loose fill or old shafts, we stop and call the engineer. Building control has to see the trench before concrete goes in.

Trench fill, where the trench is filled with concrete almost to ground level, is quick and suits narrow trenches. Strip foundations use a thinner layer of concrete with blockwork built up from it, useful where the trench is wide or deep. Near trees, the engineer may set a greater depth, so tell us about any within a few metres of the work.

The ground also changes across the district. The central coal basin has clays and mudstones that hold water, the limestone rim to the west and north drains freely but can hide fissures and old scowle workings, and the Severn-side land near Lydney and Newnham is low and soft. We dig with that in mind, but your engineer sets the foundation.

  • Trench fill and strip foundations to the engineer's design
  • Ground-bearing slabs with membrane and insulation
  • Drainage trenches to septic tanks or chambers
  • Bases for extensions, garden rooms, outbuildings and patios

Before we dig on a Forest of Dean plot

  • Check the Coal Authority's mapping and get a Coal Mining Risk Assessment if the site is in a development high-risk area
  • Have your engineer's foundation design and any soil report ready
  • Mark trees within a few metres of the work, as roots and clay can change the depth needed
  • Find the septic tank, drains and buried supply pipes before a machine goes on site
  • Check whether the plot is in a flood zone if it is on low land near the Severn or the River Lyd
  • Walk the lane to see what size of lorry and digger can reach the gate
  • Agree where spoil goes before excavation starts

Slabs, trenches and bases for the next stage

Once the foundations are in, we build up to damp-proof course, lay hardcore, sand blinding, membrane and insulation, then pour the slab. The same machine on site digs the drainage trenches, which saves a second visit. Our drainage for rural Forest homes picks up the pipework.

Most of our groundworks lead straight into a build, so the base is set out for the walls that follow. See how this fits with extensions across the Forest, compare groundworks in Cinderford town, or read about our groundworks service.

A narrow side path dug out to a red crushed-brick sub-base beside a house, with a mini digger

Planning a build that starts with a dig somewhere in the Forest? Call 07858 305739 for a free survey and bring any engineer's drawings. More local work is listed under jobs across the Forest of Dean.

Free quote

Free quote for groundworks in the Forest of Dean

  • We reply within one working day, Monday to Friday, 9am to 5pm.
  • A free, no-obligation site visit.
  • A clear written quote before any work starts.

Prefer to talk it through? Call 07858 305739.

Tell us about the job

Two details and we'll call you back.

Enter your name

Enter a phone number we can call

No obligation. Prefer to talk? Call 07858 305739, Monday to Friday, 9am to 5pm.

We only use your details to reply about this job. Privacy.

Postcodes
GL14 to GL17
Council
Forest of Dean District Council
County
Gloucestershire
Typical homes
Long, shallow-plan houses, informal terraces, tall farmhouses and Chartist cottages
Our cover
Regular cover; urgent jobs depending on the day
Local conditions

What affects groundworks in the Forest of Dean

The things about the Forest of Dean homes and ground that change how we plan and price this job, and what each one means for you.

Ground

A basin of Carboniferous rock sitting on Old Red Sandstone, where the coal measure clays, mudstones and shales of the central coal basin give poorly drained soils.1

Soil type and water in the ground decide dig depth, trench support and how spoil is handled, so we plan the dig around what the site actually holds.

The town

A district in west Gloucestershire named after the ancient woodland that covers much of it, taking in Lydney, Newent, Mitcheldean, Newnham and many villages, with Cinderford and Coleford as its other towns.2

Older streets, steep or narrow access and parking all affect how groundworks is planned in the Forest of Dean, so we look at access at the survey and build it into the timing and the written quote.

Typical homes

Long, shallow-plan houses, informal terraces, tall farmhouses and Chartist cottages.3

Older and newer homes hide different things behind walls and under floors, so we plan groundworks in the Forest of Dean around the house you have, not a standard job.

Planning authority

Forest of Dean District Council.4

Forest of Dean District Council is the planning authority for the Forest of Dean. We tell you early whether your job needs planning permission or building regulations approval, and who to apply to.

Checkatrade reviews

What our customers say

We don't have a Checkatrade review from GL14 to GL17 yet. These are word for word from our jobs across Gloucestershire, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.

  • Fantastic Service

    The boys helped us out after we had been let down by a different plumber. Really nice lads, very easy to get on with. Work carried out without any issues.

    GL14January 2026
  • Fixing a leak from loose bath taps

    This was a sudden leak. Alistair came in the evening, and thankfully was able to repair the taps so that the leak was stopped. He also did another small job, which otherwise might have led to further problems in the bathroom. He was somewhat delayed, but updated us so that we were aware, and were still very glad that he was able to come and sort the leak out straightaway. The bill was reasonable too, and the bathroom left tidy.

    GL11, DursleyJanuary 2025
  • New tap fitting in bathroom

    Prompt initial response, followed by inspection visit, quote and confirmed installation date. All handled excellently. Very smart plumber fitted the tap and was very polite and helpful.

    GL4, GloucesterFebruary 2025

Read more reviews See them on Checkatrade (opens in a new tab)

A long narrow trench dug through gravel hardstanding, with a mini digger, wheelbarrows and spoil
Real work, real customers

More Checkatrade reviews of our work

Alistair did a fantastic job. He was courteous and efficient. Left the job in a tidy state. Reasonably priced. Would highly recommend.

Fitting a new stopcockGL4July 2025

Alistair fixed our staff toilet in the office and did a great job, everything was left very clean and tidy, and he was very efficient. Would highly recommend!

Would highly recommend!GL52July 2025

This is the second job Alastair has done for me, and once again I'm really pleased with his work. He replaced a leaking outdoor tap that another plumber had said was too much hassle—but for Alastair, it was straightforward and he sorted it with no fuss. The old pipe had been leaking into my limestone walls and the tap didn’t work. Now everything's fixed, no more leaks, and the tap works perfectly. Would definitely recommend.

Fixed broken outdoor tapGL6August 2025

CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.

Where we work

Groundworks across the Forest of Dean

We cover the Forest of Dean (GL14 to GL17) and the villages around it, including Lydney. Regular cover; urgent jobs depending on the day.

    Open in Google Maps (opens in a new tab)
    FAQ

    Groundworks in Forest of Dean: questions answered

    Can't see yours? Call or email and you'll speak to the people doing the work.

    We stop work in that area and call the engineer. Voids, loose fill or a shaft need a proper assessment, and the foundation design may change, perhaps going deeper or using a reinforced raft. Building control must agree the change. It can add time and cost, which is why a mining report beforehand is worth having.

    Usually, yes. We use smaller machines, take spoil and materials in smaller loads and plan concrete deliveries carefully, sometimes pumping it from the lane. It takes more organising and adds time, which we put in the written schedule after seeing the route at the survey.

    Yes. A garden room, workshop or stable block needs a level, well-drained base suited to what sits on it, from a concrete slab to a pad foundation. We check the levels and how water will run off before deciding which, and building control applies if the building needs approval.

    Yes. Around the western and northern edge of the Forest the rock is Carboniferous limestone, which drains freely but can contain fissures, caves and old iron ore workings called scowles, like those at Puzzlewood. The central basin is clay, mudstone and shale over coal measures, which holds water. Your engineer should know which you are on before designing foundations, and we will flag anything unexpected in the trench.

    Access and spoil first. A lane that will not take a grab lorry means smaller loads and more trips, and a small extension can fill several skips. Slopes need stepped foundations and retaining walls, trees on clay can push the depth down, and a void or old shaft in a mining area means stopping for the engineer. Concrete may need pumping from the lane. We fix the price in a written quote after a free site visit.

    Free quotes & advice

    Get a no-obligation quote and straight answers about your project. We're happy to help you plan a build or renovation so it runs efficiently.

    Book a site visit
    Prefer to talk it through?07858 305739

    Lines open Monday to Friday, 9am to 5pm

    Connect with us 07858 305739 CLADevelopmentsltd@gmail.com Checkatrade reviews (opens in a new tab) Get in touch