Farmhouse kitchens with flagstones on bare earth, converted barns and Pennant sandstone cottages make up much of our underfloor heating work in the Forest. CLA Developments regularly works across the Forest of Dean and plans each floor from the ground up, matched to an oil boiler or heat pump. Ask for a free site visit and a no-obligation quote.
“The bill was reasonable too, and the bathroom left tidy.”Checkatrade review, GL11. More reviews
Underfloor heating in the Forest of Dean usually comes up when a floor is being dug out anyway: an old flagstone kitchen in a farmhouse, a barn being converted, a cottage with a damp solid floor or a new extension. That is the right time to do it, because the insulation and pipe loops go in under the new screed. CLA Developments designs and fits wet underfloor heating across the district, including systems designed to run at the low temperatures a heat pump needs. We survey the floor, check heat loss room by room and quote in writing before anything is lifted.
Old Forest floors and what lies under them
Many older Forest homes have solid floors laid straight on the ground, sometimes flagstones on earth or a thin concrete slab with no insulation or damp-proof membrane. Underfloor heating on an uninsulated floor sends much of its heat into the ground, so the build-up matters more than the pipes.
On a full dig-out we lay a damp-proof membrane, rigid insulation, edge strip and pipe loops, then screed. Where the floor level cannot rise much, a thinner low-profile system or a limecrete build-up can be considered, especially in old stone buildings where moisture needs to escape through the floor.
Where a cottage stands on the shales and clays over the Forest coalfield, the ground under the floor stays wet through the winter, so the membrane and insulation have to be right. On low land by the Severn near Awre or Newnham, it is worth asking about flood history before burying pipes and a manifold at floor level.
Is underfloor heating the best way to heat a Forest barn conversion?
Very often, because barns and big farmhouse kitchens with high ceilings and few internal walls are hard to heat with radiators. Underfloor heating warms the floor evenly and suits these spaces well. Each zone has its own thermostat, so a boot room and a living area can run at different temperatures.
We work out heat loss for each room, then design loop spacing and lengths so the floor can meet it at the planned flow temperature. If a heat pump is part of the plan now or later, the design should assume low flow temperatures from the start.
Heat loss calculated per room
Insulation suited to the floor type
Loop spacing and zoning designed, not guessed
Manifold position agreed with you
Pressure-tested before screeding
Before underfloor heating goes into a Forest floor
Find out what the floor is now: flagstones on earth, thin concrete with no membrane, or timber boards
Check whether the house is listed before lifting old flagstones, as their removal may need consent
Decide whether the flagstones go back down or are replaced with tile
Tell us the heat source now and any plan for a heat pump later
Mention past flooding if the house is near the Severn or the River Lyd
Agree where the manifold will sit, ideally in a cupboard you can reach
Floor finishes and joining up the work
Tile and stone are the best finishes over underfloor heating because they conduct heat well. Our Forest floor tilers lay porcelain and natural stone over new screeds once they have dried properly. If the heating is part of a bigger job, our renovation work in the Forest covers the rest.
Digging out a floor somewhere in the Forest of Dean? Call 07858 305739 for a free survey and we will plan the underfloor heating before the screed goes down.
Free quote
Free quote for underfloor heating in the Forest of Dean
We reply within one working day, Monday to Friday, 9am to 5pm.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL14 to GL17
Council
Forest of Dean District Council
County
Gloucestershire
Typical homes
Long, shallow-plan houses, informal terraces, tall farmhouses and Chartist cottages
Our cover
Regular cover; urgent jobs depending on the day
Local conditions
What affects underfloor heating in the Forest of Dean
The things about the Forest of Dean homes and ground that change how we plan and price this job, and what each one means for you.
Water hardness
the Forest of Dean's mains water varies by supply zone: slightly hard (about 123 mg/l as CaCO3) in Severn Trent's Forest South and Mitcheldean zones, and very hard (302 to 346 mg/l) in the Buckshaft, Lydbrook and Forest North zones.1
Hard water scales up boiler heat exchangers and system parts, which cuts efficiency. We check for it during underfloor heating in the Forest of Dean and fit a scale reducer or filter where the manufacturer recommends one.
Building materials
Carboniferous sandstone, mainly Pennant, usually coursed for building and boundary walls, with quoins in brick or dressed stone.2
Solid stone walls, timber floors and lime plaster change how pipes are routed, fixed and boxed in, so for underfloor heating in the Forest of Dean we plan pipe runs around the fabric rather than chasing through it.
The town
A district in west Gloucestershire named after the ancient woodland that covers much of it, taking in Lydney, Newent, Mitcheldean, Newnham and many villages, with Cinderford and Coleford as its other towns.3
Older streets, steep or narrow access and parking all affect how underfloor heating is planned in the Forest of Dean, so we look at access at the survey and build it into the timing and the written quote.
We don't have a Checkatrade review from GL14 to GL17 yet. These are word for word from our jobs across Gloucestershire, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Fantastic Service
The boys helped us out after we had been let down by a different plumber. Really nice lads, very easy to get on with. Work carried out without any issues.
GL14January 2026
Fixing a leak from loose bath taps
This was a sudden leak. Alistair came in the evening, and thankfully was able to repair the taps so that the leak was stopped. He also did another small job, which otherwise might have led to further problems in the bathroom. He was somewhat delayed, but updated us so that we were aware, and were still very glad that he was able to come and sort the leak out straightaway. The bill was reasonable too, and the bathroom left tidy.
GL11, DursleyJanuary 2025
Electric shower repair
Alistair was very helpful in researching and finding a cost effective solution. He also fixed an access point issue at no extra cost. Thanks Alistair!
Really good, was able to fit the tap and carried out further work to make sure everything was working smoothly.
Kitchen mixer tap installation.GL2October 2025
Had approx 8m2 of floor tiles installed, hallway and downstairs bathroom. Job included removal and refitting of vanity unit and back to wall toilet and the install of a new heated towel rail. Very helpful, efficient and friendly company who completed the job over the weekend to fit in with our plans. Would definitely recommend.
Floor tilingGL3October 2025
Alastair was very helpful & was neat and tidy when work was carried out - would recommend 👍
Yes, but the flagstones need lifting, the ground below digging out and a new insulated build-up laying before they go back. Old floors often have no damp-proof membrane, so the design must handle moisture properly. We look at the floor at survey and suggest the right build-up for the building.
Yes. It needs a mixing valve to reduce the water temperature for the floor, because an oil boiler runs hotter than underfloor heating wants. If you plan to switch to a heat pump later, design the floor for low flow temperatures now so it will still perform.
It depends on the screed type and depth. Traditional sand and cement screeds need weeks to dry, while some flowing screeds are quicker. The heating is usually commissioned gradually before tiling. We give you a realistic schedule in the quote and do not rush it, because tiling a wet screed causes cracks.
Sometimes. The flagstones are lifted, numbered and stored, the floor dug out and a new insulated build-up laid with the pipes, then the stones relaid. In a listed building that work may need listed building consent, and a breathable limecrete base is often preferred because solid stone walls need moisture to escape. Check with Forest of Dean District Council before you commit.
It can be, but only with good insulation under the floor and some draught-proofing above it. A solid sandstone cottage loses heat through walls and gaps as well as the floor, so we calculate heat loss room by room first. If the numbers show the floor alone cannot heat the room at a sensible temperature, we will say so and suggest radiators alongside.
The floor and the building. Flagstones laid on earth have to be lifted, numbered and relaid after digging out for insulation and screed, and a listed farmhouse may need consent first. Big barn floors take more pipe, more zones and a larger manifold. Narrow rural lanes can affect skips and deliveries, and an oil boiler or heat pump needs the right controls. We give a clear written quote after a free site visit.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. Whether it is a dripping tap, a cold radiator or a new bathroom, we will look at the job and tell you plainly what it needs.