We work as extension builders across the Forest of Dean regularly, from Newent to Lydney, and CLA Developments takes each job from groundworks to a finished room with one team. The Coal Authority treats parts of the district as high-risk mining areas, so ground checks and the Forest of Dean District Council planning route are settled at a free site visit.
“The bill was reasonable too, and the bathroom left tidy.”Checkatrade review, GL11. More reviews
Extension builders in the Forest of Dean deal with ground that can surprise people. Plots slope, old mine workings run under parts of the district and a stone cottage needs an extension that sits well beside it. CLA Developments builds single and two-storey extensions, garden rooms and new builds across the district, from Newent down to Lydney, handling the groundworks, structure, plumbing, plastering and tiling with one team. We can build from your existing drawings or work alongside your architect and engineer, and every job starts with a free survey and a written quote with a realistic schedule.
Why do Forest of Dean extensions start with the ground?
Because ground conditions vary a lot across the Forest. A sloping garden may need stepped foundations or a retaining wall, and the bottom of a valley can be wetter than the top. In the old mining areas, a mining report and your engineer's advice should come before the foundation design, because shallow workings change what is needed.
Once we dig, building control inspects the trenches before concrete goes in. If what we find differs from the drawings, we stop and talk to you and the engineer before carrying on. That is far cheaper than discovering a problem once the walls are up.
The ground itself varies. Clays and mudstones in the central coal basin hold water, the limestone on the western and northern rim can hide fissures and old iron workings, and the land near the Severn at Lydney, Awre and Newnham sits low enough to appear on flood alerts. Each of these changes what your engineer specifies.
Planning, stone and matching the house
Many extensions fall under permitted development, but listed buildings, conservation areas and land within the Wye Valley National Landscape need more care. Check with Forest of Dean District Council or the Planning Portal, and our guide to planning an extension walks through the early decisions.
Pennant sandstone has been quarried in the Forest for centuries, and an extension in matching stone or a sympathetic render can look as if it has always been there. On older homes we use lime mortar where the new work meets old stone walls, so moisture can still move through the building.
Survey and look at your drawings
Check ground, access and any mining report
Written quote with schedule
Groundworks and foundations inspected
Shell, roof and openings
Plumbing, heating, plastering and tiling to finish
Before we price an extension in the Forest of Dean
Ask your engineer or conveyancer whether the plot falls in a Coal Authority high-risk area, as the council may then want a mining risk assessment with the application
Confirm listed status and conservation area boundaries with the council, especially in Newent, Lydney or Mitcheldean
Look up the flood map if the garden runs down towards the Severn or the River Lyd
Locate the septic tank or drainage field, as an extension cannot be built over it
Ask a Pennant sandstone supplier for samples if the extension will be faced in stone
Tell us about weight limits, tight bends or low bridges on the way to the house
Kitchens, garden rooms and bedrooms in Forest extensions
Most Forest extensions are kitchens, garden rooms or extra bedrooms. We take the shell through to a full finish, so the drainage, heating and plastering are planned with the structure. Our kitchen fitting in the Forest and plastering and making good are part of the same job.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL14 to GL17
Council
Forest of Dean District Council
County
Gloucestershire
Typical homes
Long, shallow-plan houses, informal terraces, tall farmhouses and Chartist cottages
Our cover
Regular cover; urgent jobs depending on the day
Local conditions
What affects an extension in the Forest of Dean
The things about the Forest of Dean homes and ground that change how we plan and price this job, and what each one means for you.
Ground
A basin of Carboniferous rock sitting on Old Red Sandstone, where the coal measure clays, mudstones and shales of the central coal basin give poorly drained soils.1
Ground conditions decide how deep the foundations go and how the extension is drained, so we check them before quoting and allow for them in writing.
Building materials
Carboniferous sandstone, mainly Pennant, usually coursed for building and boundary walls, with quoins in brick or dressed stone.2
We match or work with the materials your house is actually built from, so the new work sits right with the original fabric and stays sound.
The town
A district in west Gloucestershire named after the ancient woodland that covers much of it, taking in Lydney, Newent, Mitcheldean, Newnham and many villages, with Cinderford and Coleford as its other towns.3
Older streets, steep or narrow access and parking all affect how an extension is planned in the Forest of Dean, so we look at access at the survey and build it into the timing and the written quote.
Forest of Dean District Council is the planning authority for the Forest of Dean. We tell you early whether your job needs planning permission or building regulations approval, and who to apply to.
We don't have a Checkatrade review from GL14 to GL17 yet. These are word for word from our jobs across Gloucestershire, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Fantastic Service
The boys helped us out after we had been let down by a different plumber. Really nice lads, very easy to get on with. Work carried out without any issues.
GL14January 2026
Fixing a leak from loose bath taps
This was a sudden leak. Alistair came in the evening, and thankfully was able to repair the taps so that the leak was stopped. He also did another small job, which otherwise might have led to further problems in the bathroom. He was somewhat delayed, but updated us so that we were aware, and were still very glad that he was able to come and sort the leak out straightaway. The bill was reasonable too, and the bathroom left tidy.
GL11, DursleyJanuary 2025
Pleased with the Finished Result
Happy with the job. The shower tray needed replacing and there was some uncertainty about possible water damage underneath, but everything was explained clearly before the work went ahead. The work was completed to a good standard, within excellent time, and the new shower is super sturdy. Thank you
Alistair was quick, efficient and respectful while replacing our stop valves. He made the system more accessible and removed the unnecessary pipes that were redundant.
Kitchen taps.GL1November 2024
It was an emergency call out in the evening and he came to us immediately. It couldn’t be fixed there and then, but he left us in a better state than we were and returned the following evening to fix it, despite being fully booked. The job was done quickly and cleanly. Great service.
Fixed radiator leakGL6November 2024
Lovely job. Worked hard to get job completed in a day. Several unexpected issues came up which were overcome quickly.
Refit downstairs cloakroomGL3November 2024
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
It is often wise. The district has a long coal and iron mining history, and shallow workings can affect foundation design. Your conveyancer or engineer can advise whether a report is needed for your site. We build the foundations to the engineer's design and stop if the ground differs from what was expected.
Usually, yes. Forest Pennant sandstone is still quarried locally, and choosing stone with a similar colour and coursing makes a big difference. Using lime mortar and copying the pointing style helps the new work blend in. Where matching is not practical, a well-detailed render can look better than a poor stone match.
There are four stages, and the written quote sets out the programme for each. A free survey comes first, then drawings, a mining check where the Coal Authority flags the plot, and the Forest of Dean District Council planning route with building control. On a sloping plot or near the Severn flood zones, the groundworks take more planning. Then the shell, roof and stonework to match the cottage go up, and plastering, tiling and snagging finish the room.
Set out a brief, then get drawings. Check with Forest of Dean District Council whether you need planning permission: the district has 27 conservation areas, including Newent, Lydney, Newnham and St Briavels, where permitted development rights are tighter. Ask whether a mining risk assessment or a flood risk assessment applies to your plot. Building regulations approval comes next, plus party wall notices if you share a wall. Then ask us for a free site visit and a written builder's quote.
Often, yes, but the design needs to allow for it. Low land near Lydney, Awre, Newnham and Westbury appears on Severn flood alerts, and a planning application there may need a flood risk assessment. Raised floor levels, flood-resilient finishes and services set above likely flood level are common answers. Your designer should check the flood map before drawings are finalised, and we build to what they specify.
Ground, access and walling. A plot in a Coal Authority high-risk area may need a mining risk assessment and a different foundation, and slopes bring stepped footings or retaining walls. Low land near the Severn may need raised floors. Narrow lanes mean smaller deliveries, a septic tank cannot be built over, and facing in Pennant sandstone with lime mortar costs more than render. We fix the price in a written quote after a free site visit.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. We're happy to help you plan a build or renovation so it runs efficiently.