Who handles groundworks in Dursley and Cam? CLA Developments does, digging extension foundations with trench fill, slabs, patio bases and drain runs set for the Lias clay and spring water below Stinchcombe Hill. Trees on clay can push foundations deeper, and we price that honestly. We cover the GL11 area; ask for a free site visit and written quote.
“The bill was reasonable too, and the bathroom left tidy.”Checkatrade review, GL11. More reviews
Lias clay under much of Dursley and Cam decides most groundworks in Dursley before anyone picks up a spade. It sits below the oolitic limestone of the escarpment, moves as it wets and dries, turns heavy and sticky in winter and reacts to tree roots, and on sloping plots water from the hill breaks out where it meets the clay. We excavate, lay trench fill and strip foundations, cast slabs, dig drainage trenches and build bases for extensions and patios. The survey looks at soil, trees, drains, springs and access, and the written quote explains what could change once the ground is open.
Foundations on Dursley's Lias clay, springs and slopes
On the valley sides below Stinchcombe Hill, the ground is a layer cake: limestone on top, then sands, then Lias clay. Water soaks down through the upper beds and comes out as springs where it reaches the clay, which is why some Dursley trenches stay wet in a dry week while next door's stays dry. When we hit running water in a trench, we pump it, find where it is coming from and talk to building control and your engineer before pouring, because a foundation sitting in a spring line may need land drains or a different design.
Trees add depth on clay because roots draw moisture out of it, and where a tree has been removed, swelling becomes the risk, so compressible board against the trench and under the slab may be specified. Trench fill, poured close to ground level, is common on clay. The escarpment has one of the highest inland concentrations of landslips in England, so on a steep plot your engineer may want a site investigation before the design is fixed.
Mark trees and shrubs near the work, including neighbours'
Find drains and manholes across the garden
Check side access for a mini digger
Tell us about any trees felled in recent years
Slabs, beam-and-block floors and patio bases in GL11
A ground-bearing concrete slab suits most extension floors, laid on compacted hardcore with a membrane and insulation. Where the foundations are deep or heave is a risk, a suspended beam-and-block floor spans between the walls instead, with a ventilated void beneath. The engineer's design or building control decides which.
Patio bases need a compacted sub-base, and on clay a thicker one helps spread the load and stop the paving rocking. Water is the issue, since clay will not soak it away, so the base and falls are planned with the drainage. For the paving above, see Dursley patio installs.
Before we dig foundations in Dursley
Note any wet patches or springs in the garden, common where hill water meets Dursley's Lias clay.
Mark trees and shrubs near the work, including neighbours' and any felled in recent years.
On steep plots below Stinchcombe Hill, ask your engineer whether a site investigation is needed.
Find drains and manholes across the garden before the digger arrives.
Check side access for a mini digger and space for clay spoil, which bulks up once dug.
Plan for wet-weather delays, as clay trenches soften after heavy rain.
Can foundations be dug in a wet Dursley winter?
Yes, with care. Clay trenches fill with water after rain and soften at the bottom, so we pump them out and clean down to firm ground before a pour, and avoid leaving trenches open longer than needed. Deeper trenches beside existing walls, or in loose ground, need support. Drain runs are dug and laid in step with the foundations, and our drainage runs in GL11 covers falls and connections.
Clay spoil bulks up once dug and is rarely good for reuse, so allow for skips or a grab lorry. On estates with tight parking we plan deliveries and muck-away times at the survey.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL11
Council
Stroud District Council
County
Gloucestershire
Typical homes
Older market town centre and a large new housing development on the former Lister Petter factory site
Our cover
Regular cover; urgent jobs depending on the day
Local conditions
What affects groundworks in Dursley
The things about Dursley homes and ground that change how we plan and price this job, and what each one means for you.
Ground
On the Marlstone Rock terrace of the Cotswold escarpment, between the oolitic limestone of the higher scarp and the Lias Group clays below, with a spring line beneath the Marlstone.1
Soil type and water in the ground decide dig depth, trench support and how spoil is handled, so we plan the dig around what the site actually holds.
The town
A market town under the north-east flank of Stinchcombe Hill, next to Cam, known for the Lister engine works and its 1738 Town Hall.2
Older streets, steep or narrow access and parking all affect how groundworks is planned in Dursley, so we look at access at the survey and build it into the timing and the written quote.
Typical homes
Older market town centre and a large new housing development on the former Lister Petter factory site.2
Older and newer homes hide different things behind walls and under floors, so we plan groundworks in Dursley around the house you have, not a standard job.
Conservation and listing
Dursley Conservation Area, designated by Stroud District Council on 23 November 1989.3
Work in a conservation area or on a listed building can need consent from Stroud District Council; we flag it at the survey so nothing is started that needs permission first.
Word-for-word Checkatrade reviews from our nearest jobs to Dursley, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Fixing a leak from loose bath taps
This was a sudden leak. Alistair came in the evening, and thankfully was able to repair the taps so that the leak was stopped. He also did another small job, which otherwise might have led to further problems in the bathroom. He was somewhat delayed, but updated us so that we were aware, and were still very glad that he was able to come and sort the leak out straightaway. The bill was reasonable too, and the bathroom left tidy.
GL11, DursleyJanuary 2025
New bathroom and WC room.
Alistair did a fantastic job of fitting a very snazzy new bathroom and WC room. He did some excellent tiling and did some extra plumbing work for us too. He worked very very hard and we were impressed with his work ethic. thank you
GL5, StroudJune 2025
Shower installation
I am very happy with the work that Alistair did for me. He came within one day of me contacting him. I highly recommended him to anyone who needs a reliable and competent plumber. I will definitely use him again in the future.
recently had my bathroom completely updated, including a new bath, shower installation, and tiling work, and I couldn’t be happier with the results. From start to finish, the service was professional, reliable, and of a very high standard. Everything was clearly explained before the work began, and the attention to detail throughout the project really stood out. The tiling in particular is neat and precise, and the overall finish has completely transformed the space. The work was completed on time, with minimal disruption, and everything was left clean and tidy at the end of each day.
BathroomupgradeGL4April 2026
Fitted new shower pump with no problems to replace our old failing one. Friendly and helpful service.
Shower pump replacement.GL6April 2026
I was so nervous about this project. I was on a tight budget but knew what I wanted and Andy was fantastic from start to finish. Super reliable, excellent communication, highly skilled and trustworthy I now have a gorgeous bathroom and can’t recommend him highly enough. Every tradesperson he used was excellent at their job and his supervision and advice made the whole process easy, and both time and cost efficient. Brilliant work, trustworthy, honest and hard working. I hope this review makes Andy blush, he should be proud.
Gutted old bathroom including floor and timing then fitted new suite, floor, walls etcGL3April 2026
Roots draw moisture from clay, which makes it shrink, so foundations near trees need to go deeper. The species, height and distance all matter, including trees in a neighbour's garden. Where trees have been felled, swelling is the risk instead, and the design may add heave protection. Building control confirms the depth on site.
It is compressible material placed against the trench sides and under the slab or ground beams, which gives swelling clay room to expand without pushing the building up. It is used where trees have been removed or the clay is dry and likely to swell. Your engineer or building control will specify it where needed.
We stop, pump the trench and trace where the water is coming from. Springs are common on the Dursley slopes because water draining through the limestone comes out on the clay below. Building control and your engineer decide what is needed, which may be land drains to carry the water away, a deeper or wider foundation, or a different design. It is better found at the trench stage than after the walls go up.
The depth the clay demands. Lias clay near trees can need deeper trench fill and heave protection, and building control decides the final depth at inspection. Spring water on the slopes means pumping and sometimes land drains. Choosing a slab or beam-and-block floor changes the work, and sloping gardens below the escarpment produce more spoil to remove. We dig into these questions at a free site visit and set them out in a clear written quote.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. We're happy to help you plan a build or renovation so it runs efficiently.