New homes on the old Lister site and post-war semis with single-storey extensions are where most Dursley underfloor heating goes in. CLA Developments covers GL11 and handles the full build-up, from insulation and screed to the manifold and controls. Arrange a free site visit and you get a written quote with no obligation.
“The bill was reasonable too, and the bathroom left tidy.”Checkatrade review, GL11. More reviews
Underfloor heating in Dursley is most often fitted when a floor is coming up anyway: a new single-storey extension on the back of a semi, or a kitchen and dining room being knocked into one big space on a concrete ground floor. That is the point where a wet system, with pipe loops buried in a screed, costs least to add and works best. It gives even heat across a large room without radiators taking up wall space you would rather use for units or glazing. We lay the insulation and pipe, fit the manifold, pour or arrange the screed and tile or finish the floor.
Wet underfloor heating in screed on GL11 ground floors
On a new extension slab, the build-up is usually rigid insulation over the slab and damp-proof membrane, a perimeter edge strip, then the pipe clipped at the spacing the heat loss calculation asks for, then a screed of around 50mm or more over the top. The insulation matters most. Dursley sits on Lias clay below the limestone escarpment, and that clay holds moisture and draws heat out of an uninsulated floor, so we never skimp on the board under the pipe.
In an existing kitchen with an old concrete floor, there may not be enough height to dig down. A low-profile overlay system, with pipe set into grooved boards and a thin levelling compound on top, can work where the floor can only rise by a small amount. We measure door thresholds and the step to the next room before choosing.
Extensions on plots cut into the valley side can have one end of the slab below garden level, where ground water from the hill tends to collect after rain. A sound membrane and edge insulation along that uphill wall keep the floor warm and dry.
Where does the underfloor heating manifold go in a Dursley house?
Usually in a utility cupboard, under the stairs or in a kitchen base unit with a removable panel, because every loop runs back to a manifold that you need to be able to reach. Loops are kept to sensible lengths so each one heats evenly. In an open-plan kitchen-diner, splitting the floor into zones lets the dining end run cooler than the cooking end, or the sunny glazed corner switch off on bright days.
Each zone gets its own thermostat. If the rest of the house stays on radiators, the underfloor runs at a lower temperature through a mixing valve on the manifold, so the boiler can serve both. Dursley's hard water, at around 201 mg/l, is another reason to fit a magnetic filter and keep inhibitor topped up, because scale and sludge in a long floor loop slow it down.
Agree the manifold position before the walls are finished
Plan zones around how you use the room
Keep floor coverings with a low thermal resistance
Before we lay underfloor heating in Dursley
Tell us if the extension is cut into the slope, as the uphill wall of a Dursley plot needs extra damp and edge protection.
Check how much floor height you can lose at doorways in an older semi or Woodmancote terrace.
Decide where the manifold will go before the walls of the new room are finished.
Ask whether a heat pump might follow, so loops are spaced for low flow temperatures.
Plan a magnetic filter and inhibitor, since GL11's hard water scales long loops.
Choose floor coverings, such as porcelain, that let the heat through.
Screed drying and the finished floor
New screed holds a lot of water. It has to dry before tiles or timber go down, and the heating is brought up slowly over several days rather than switched straight on. Rushing it is how floors crack. We test moisture before the floor finish goes down, and porcelain tiles over a decoupling membrane give a durable, fast-warming surface. Our floor tiling in Dursley covers that step, and for the building side see our extensions in GL11.
Hard water scales up boiler heat exchangers and system parts, which cuts efficiency. We check for it during underfloor heating in Dursley and fit a scale reducer or filter where the manufacturer recommends one.
Building materials
Limestone ashlar and tufa in the oldest buildings, such as St James's church, built of ashlar limestone and coursed tufa limestone rubble.2
Solid stone walls, timber floors and lime plaster change how pipes are routed, fixed and boxed in, so for underfloor heating in Dursley we plan pipe runs around the fabric rather than chasing through it.
The town
A market town under the north-east flank of Stinchcombe Hill, next to Cam, known for the Lister engine works and its 1738 Town Hall.3
Older streets, steep or narrow access and parking all affect how underfloor heating is planned in Dursley, so we look at access at the survey and build it into the timing and the written quote.
Word-for-word Checkatrade reviews from our nearest jobs to Dursley, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Fixing a leak from loose bath taps
This was a sudden leak. Alistair came in the evening, and thankfully was able to repair the taps so that the leak was stopped. He also did another small job, which otherwise might have led to further problems in the bathroom. He was somewhat delayed, but updated us so that we were aware, and were still very glad that he was able to come and sort the leak out straightaway. The bill was reasonable too, and the bathroom left tidy.
GL11, DursleyJanuary 2025
New bathroom and WC room.
Alistair did a fantastic job of fitting a very snazzy new bathroom and WC room. He did some excellent tiling and did some extra plumbing work for us too. He worked very very hard and we were impressed with his work ethic. thank you
GL5, StroudJune 2025
Shower installation
I am very happy with the work that Alistair did for me. He came within one day of me contacting him. I highly recommended him to anyone who needs a reliable and competent plumber. I will definitely use him again in the future.
We used AJH Plumbing and Heating to remove and install two bathrooms. They turned up when they said they would and despite challenges and needing to change materials part way through they worked really hard. We are very pleased with the end result.
Bathroom fittingGL3July 2026
Alistair responded quickly from initial job on check a trade and kept informed at all times. Tidy and friendly. Highly recommend.
Replaced a kitchen tap.GL5May 2026
Happy with the job. The shower tray needed replacing and there was some uncertainty about possible water damage underneath, but everything was explained clearly before the work went ahead. The work was completed to a good standard, within excellent time, and the new shower is super sturdy. Thank you
Pleased with the Finished ResultGL3May 2026
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Often, yes. If the old screed can be broken out, a full system with insulation and new screed can go in. If not, a low-profile overlay adds only a small amount of height. We check thresholds, door heights and the step into adjoining rooms before recommending either option.
It depends on the thickness and type of screed and on the weather, and traditional sand and cement screed needs much longer than quick-drying types. We follow the manufacturer's guidance, bring the heating up gradually and test moisture before tiling. Tiling too soon is the main cause of cracked floors.
Usually. The underfloor zone runs through a mixing valve and pump at the manifold, which drops the water temperature to suit the floor, while the radiators keep running hotter. We check the boiler's output can cover the extra area before fitting.
Only if the floor is not insulated properly. The Lias clay under much of Dursley holds moisture, and damp ground draws heat away faster than dry ground. With rigid insulation under the pipes and an edge strip round the walls, almost all the heat goes up into the room. We size the insulation to the building regulations and the room, and check the membrane underneath first.
Yes, and it is one of the best pairings, because a well-insulated screed floor works at the low flow temperatures a heat pump prefers. Pipe spacing is usually closer than for a boiler-fed floor. If you think a heat pump might come later, tell us now so the loops are laid to suit, and see our heat pump advice.
How the floor is built and how much has to change. A new extension slab is simplest. An existing concrete kitchen floor either takes a low-profile overlay or is broken out, which adds labour and spoil removal, and on steep streets below the escarpment, skips and parking can be awkward. Damp ground near the spring line can call for a better membrane and more insulation. Zones, controls and the floor finish add up too. We give a clear written quote after a free site visit.
Free quotes & advice