Taking out the bath for a shower someone can walk straight into is the usual Malmesbury request, and CLA Developments covers the town for planned wet room projects. First-floor rooms in old limestone houses and ground floors on the low streets near the two Avons each need a different floor. A free site visit and quote come first.
“Great communication up front and the whole job was done less than 24 hours later.”Checkatrade review, GL6. More reviews
Most people who ring wet room installers in Malmesbury want to know if we can take out the bath and give someone a shower they can walk straight into. Usually the answer is yes, but how it is done depends on the floor. A first-floor room in one of the old town's limestone houses has timber joists that may be notched and uneven. A ground-floor room in a cottage may have a solid floor with no damp proof membrane. A newer home at Filands or Backbridge may have a chipboard floor on modern joists. We look at which one you have, then build the floor, tank it, lay it to falls and tile it with one team.
Forming a wet room floor in a Malmesbury house
On a timber floor, the joists set the limits. We check their size, span and any old notches, and add noggins or sister joists where needed. Then we choose between a pre-formed level-access former, which drops between the joists, and a very low tray. The waste has to leave the room with a steady fall, and in older houses with long runs to the soil stack, that sometimes decides where the drain goes.
A solid ground floor is a different job. To get falls without a step, we may need to break out part of the slab and lay new, with a membrane under it. That is worth doing properly in an old cottage, where the floor may have no damp proof layer at all. In homes on the lower ground near the river, we also think about floor levels and keeping fittings off the floor where possible.
Every wet room is fully tanked: walls and floor sealed with a membrane system, corners taped and pipe entries sealed before any tile goes on.
Wet room or walk-in shower under Malmesbury roofs and on its low streets
A full wet room has no tray, with the floor falling to a linear or centre drain; a walk-in shower uses a low tray with a glass panel. Our guide to choosing between them explains the differences. In the old town's attic bathrooms under stone tile roofs, a walk-in shower with a single screen is often more practical, as the joists leave little depth for a level-access former.
On the ground floor of homes on St John's Street, Lower High Street or Baskerville, where water came up through floors in December 2013, a fully tanked and tiled wet room recovers from flooding far better than a carpeted bathroom.
If you need level access because of mobility, tell us at the start, as grab rails need solid fixings planned into stud walls or the limestone behind. A customer in Cheltenham said Alistair did "an amazing job" turning their dad's bathroom into a shower, which is a job we are asked to do often.
Before we build a wet room in Malmesbury
Tell us whether the room is upstairs on timber joists or on a solid ground floor, as in many old cottages.
In a listed house, check with Wiltshire Council before lifting an original floor to form the falls.
Find the soil stack, as long runs in old town houses decide where the drain can go.
On the low ground by the Avon, plan floor levels and keep fittings off the floor.
Tell us who will use it and whether grab rails or a seat are needed.
Measure head height in an attic bathroom where the shower would sit under the slope.
Which tiles work best on a Malmesbury wet room floor?
Slip-resistant tiles sized to suit the drain you choose. Wet room floors need tiles with good slip resistance and enough grout lines to follow the falls. Smaller tiles or mosaic suit a centre drain, while larger porcelain works well with a linear drain along one wall. Photos of a slate-effect wet room with an electric shower and other walk-in showers are in our gallery.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
SN16
Council
Wiltshire Council
County
Wiltshire
Typical homes
Limestone hilltop centre, 1930s to 1970s council homes, newer estates
Our cover
Larger jobs; call us about urgent work
Local conditions
What affects a wet room in Malmesbury
The things about Malmesbury homes and ground that change how we plan and price this job, and what each one means for you.
Water hardness
Malmesbury's mains water is very hard (about 317 mg/l as CaCO3, Wessex Water's Zone 52 Milbourne).1
Hard water leaves scale on shower heads, screens, taps and boiler heat exchangers. For a wet room in Malmesbury we choose fittings that are easy to descale and recommend scale protection where it genuinely helps.
Building materials
Limestone ashlar and rubble walling and stone tile roofs in older buildings.2
Solid stone walls, timber floors and lime plaster change how pipes are routed, fixed and boxed in, so for a wet room in Malmesbury we plan pipe runs around the fabric rather than chasing through it.
The town
Malmesbury is a market town in Wiltshire, 5 miles south of Tetbury, set on a flat Cotswolds hilltop where two rivers meet.2
Older streets, steep or narrow access and parking all affect how a wet room is planned in Malmesbury, so we look at access at the survey and build it into the timing and the written quote.
Word-for-word Checkatrade reviews from our nearest jobs to Malmesbury, each with the postcode the work was in. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Fixed broken outdoor tap
This is the second job Alastair has done for me, and once again I'm really pleased with his work. He replaced a leaking outdoor tap that another plumber had said was too much hassle—but for Alastair, it was straightforward and he sorted it with no fuss. The old pipe had been leaking into my limestone walls and the tap didn’t work. Now everything's fixed, no more leaks, and the tap works perfectly. Would definitely recommend.
GL6August 2025
Fixed 3 toilet cisterns, investigated a leak and re-aligned a tap.
Alastair has been prompt at replying. He fixed everything I asked for in advance, plus something extra I asked about on the day. Alastair is polite, efficient and reasonably priced.
GL6July 2025
Kitchen tap replacement
Absolutely perfect. Great communication up front and the whole job was done less than 24 hours later. Couldn't have asked for any better!
Prompt reply to repair request, all sorted very quickly.
Toilet cistern repairGL5December 2025
Great service, Alistair was friendly and pleasant and the job was completed to a high standard.
Heating and plumbingGL50January 2026
The boys helped us out after we had been let down by a different plumber. Really nice lads, very easy to get on with. Work carried out without any issues.
Yes, in most houses. We check the joists, strengthen them where needed and fit a level-access former or low tray between them. The floor is then boarded, tanked and tiled to falls. The main limit is the waste route, which needs a steady fall to the soil stack.
Often part of one. To create falls without a step, we usually break out an area of the existing floor and relay it with a membrane underneath. Many older cottage floors have no damp proof layer, so this is a chance to put one in.
It depends on the floor and the room, so we give a realistic schedule in the written quote. Tanking and adhesives need curing time between stages, and rushing that is how wet rooms fail. We plan the work so you know which days the room is out of use.
It can be. A fully tanked room with tiled floor and walls dries out and cleans up far better than one with carpet, laminate or a boxed-in bath. Ground floors on St John's Street, Lower High Street and around Baskerville have flooded several times, so we keep fittings off the floor where possible and plan the drain and floor level with care.
Floor and position count most. On an upstairs timber floor, old notched joists need checking and stiffening before a former goes in. Ground floors in old stone houses may need breaking out, with a membrane added where there is none. On low streets such as St John's Street, where water came up through floors in 2013, flood-resilient choices matter. Tiles suited to the falls and accessibility features add to it. Everything is itemised in a clear written quote after a free site visit.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. Whether it is a dripping tap, a cold radiator or a new bathroom, we will look at the job and tell you plainly what it needs.