In a town of front steps and steep stairs, CLA Developments builds Stroud wet rooms so at least the shower is step-free, over suspended timber in terraces and cottages or in mill flats with shared stacks. We work in Stroud regularly. Water hardness varies across GL5, so drains are chosen to suit. Free site visit and quote.
“He was professional and thorough in the midst of the emergency situation.”Checkatrade review, GL5. More reviews
One question reaches wet room installers in Stroud more than most: whether the shower can be made easier to use in a house where everything else involves steps. In a town built on hillsides, with front doors up flights of steps and stairs at every level, a level-access shower can make a real difference to staying in your home. We build full wet rooms and walk-in showers on both timber and solid floors, with the floor tanked, laid to falls and tiled by the same team. Every job starts with a free survey to check the floor, the drainage route and the space.
Building a wet room on Stroud floors
Upstairs in most Stroud terraces and cottages the floor is suspended timber. To get a level entry, we usually cut the joists down carefully or fit a pre-formed sloping former between them, then lay a rigid deck, tank it and tile. Joists must stay strong enough, so we check their size and condition first and add support where needed.
On a ground floor, especially in older cottages, the floor may be solid stone or concrete. Here we break out a channel for the waste, lay a screed with falls to the drain and tank before tiling. The waste route is the deciding factor, and on split-level hillside houses it is sometimes easier to drain a ground floor wet room out through the back wall than to reach the main stack.
Tanking over the whole floor and at least the lower walls, with taped corners
A linear drain along one wall or a centre drain with four-way falls
Slip-resistant tiles, often smaller formats on a sloping floor
An extractor sized for the room and ducted outside
How can a wet room make a Stroud bathroom easier to use?
By removing the step into the shower and adding support exactly where it is needed. For anyone finding the bath harder to climb into, a wet room removes the step altogether. We can add grab rails into solid fixings, leave space for a shower seat and choose a thermostatic valve that guards against sudden changes in temperature. Glass panels can be kept short so a carer can help.
Floor finish matters as much as the drain. Our floor tilers in Stroud lay the wet room floor as part of the same job, and if you are refitting the whole room, our bathroom refits in Stroud cover the toilet, basin and storage too. Not sure which option is right? Our wet room or walk-in shower guide sets out the differences.
Before a wet room is built in Stroud
Check whether the room has a lath and plaster ceiling below, common in Stroud's older terraces
Find where the soil stack runs on a house that steps up the hill
For a ground floor room dug into the slope, look for damp or spring water under the floor
In a mill flat, get the managing agent's agreement for work on floors and drains
Plan an extractor route that avoids the front wall in a conservation area
Think about grab rail positions and a seat before the walls are boarded
Level-access showers for Stroud's stepped houses and mill flats
Stroud's housing makes level access especially useful. The terraces of the Brick Quarter climb the slope with front steps up from the pavement, cottages on the valley sides have stairs at every turn, and in a converted mill flat a wet room can replace a bath without changing the layout, though the building's managing agent needs to agree work on the floor and drains. We also build level-access showers in Gloucester and wet rooms in Tetbury. See the wider wet room service, or the other jobs we cover around Stroud.
Thinking about a level-access shower in Stroud? Call 07858 305739 and we will visit, check the floor and drainage, and send a clear written quote.
Free quote
Free quote for a wet room in Stroud
We reply within one working day, Monday to Friday, 9am to 5pm.
That didn't send, sorry. Please try again, or call 07858 305739.
Postcodes
GL5 and GL6
Council
Stroud District Council
County
Gloucestershire
Typical homes
Stone cottages and Victorian red brick terraces with stone dressings
Our cover
Regular cover, including urgent call-outs
Local conditions
What affects a wet room in Stroud
The things about Stroud homes and ground that change how we plan and price this job, and what each one means for you.
Water hardness
Stroud's mains water varies: slightly hard to hard depending on supply zone (GL5 zones typically 123 to 283 mg/l).1
Hard water leaves scale on shower heads, screens, taps and boiler heat exchangers. For a wet room in Stroud we choose fittings that are easy to descale and recommend scale protection where it genuinely helps.
Solid stone walls, timber floors and lime plaster change how pipes are routed, fixed and boxed in, so for a wet room in Stroud we plan pipe runs around the fabric rather than chasing through it.
The town
A former cloth town at the meeting point of the Five Valleys, noted for its steep streets, with the Stroudwater Navigation and the Thames and Severn Canal.3
Older streets, steep or narrow access and parking all affect how a wet room is planned in Stroud, so we look at access at the survey and build it into the timing and the written quote.
Word-for-word Checkatrade reviews from jobs in GL5 and GL6. CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Alistair came out on a Friday night to fix a leak in my kitchen. He was professional and thorough in the midst of the emergency situation. Realising the previous plumber and kitchen fitter had done a very poor job, I then asked him to fix the nightmare situation for me which he did. The kitchen has been fine ever since. He is polite and timely and always clears up. I am very grateful to him and wouldn't hesitate to recommend his service.
GL5, StroudJanuary 2026
Perfect plumbers!
We highly recommend these guys - they did everything we needed & were a pleasure to deal with. Perfect - thank you!
Prompt reply to repair request, all sorted very quickly.
Toilet cistern repairGL5December 2025
This is the second job Alastair has done for me, and once again I'm really pleased with his work. He replaced a leaking outdoor tap that another plumber had said was too much hassleābut for Alastair, it was straightforward and he sorted it with no fuss. The old pipe had been leaking into my limestone walls and the tap didnāt work. Now everything's fixed, no more leaks, and the tap works perfectly. Would definitely recommend.
Fixed broken outdoor tapGL6August 2025
Alistair did a fantastic job of fitting a very snazzy new bathroom and WC room. He did some excellent tiling and did some extra plumbing work for us too. He worked very very hard and we were impressed with his work ethic. thank you
New bathroom and WC room.GL5June 2025
CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.
Usually, yes. Most upstairs floors in terraces are timber, and we create the fall by trimming joists or fitting a sloping former, then deck, tank and tile it. We check the joists and the route to the soil stack at the survey. If the room is too small or the joists cannot be cut, we suggest a low-profile tray instead.
It often is, because there is no step or tray edge to climb over. We add grab rails into solid fixings, slip-resistant tiles and a thermostatic valve, and leave space for a seat. In a hillside house with plenty of stairs, a ground floor wet room can be the most useful change.
Not if it is tanked and drained properly. We waterproof the whole floor and the lower walls, tape every corner and joint, and lay falls that carry water to the drain. That matters in Stroud's older terraces, where a slow leak would soon stain the lath and plaster ceiling below. Most wet room leaks come from skipped tanking or flat floors, so we take extra care over both.
Most take one to two weeks, including drying time for screed and tanking before tiling. A ground floor room on a solid floor can take longer if we need to break out the floor for the waste, and on slopes where springs keep the ground damp a membrane has to go in first. We give you a realistic schedule in the written quote.
Often, yes. Many flats in the old cloth mills along the Frome have concrete floors, which can take a sloped screed and a linear drain. The catch is the flat below and the shared drains, so the managing agent usually needs to agree the work first. We check the floor build-up, the waste route to the shared stack and the building's rules at the survey.
Floor, stack and access are the main factors. Upstairs in Stroud terraces and cottages, the timber floor has to be dropped or a former fitted between joists, with any lath and plaster ceiling below protected. In a mill flat the shared stack fixes the drain position and the managing agent may set rules. Steep streets with little parking slow deliveries. Accessibility features and tile choice add to it. We set all of this out in a clear written quote after a free site visit.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. Whether it is a dripping tap, a cold radiator or a new bathroom, we will look at the job and tell you plainly what it needs.