Whether your Gloucester floor is Victorian timber in Kingsholm or a concrete slab in a newer home sets how CLA Developments builds a wet room, and the city is one of our regular areas. Many enquiries come from families planning ahead for a parent. Moderately hard water guides our drain choice. A free site visit and quote come first.
“Al and the team did a great job and were a great team.”Checkatrade review, GL4. More reviews
Almost everything about a wet room depends on the floor, so it is the first thing we check as wet room installers in Gloucester. A wet room needs the whole floor to fall gently to a drain, and the way we achieve that on a Victorian timber floor in Kingsholm is very different from a concrete slab in a 1990s house at Abbeymead. Some people want a stylish walk-in shower in place of an old bath. Others need step-free access for a parent who struggles with a bath. Either way, we survey, explain the options for your floor and give you a written quote.
Timber floors versus concrete slabs in Gloucester homes
Upstairs in a terrace or semi, and on the ground floor of many older Gloucester houses, the floor is timber joists with boards on top. That is good news for a wet room. We can lift the boards, fit a pre-formed shower former or a fall-built ply deck between the joists, and drop the drain down to meet the waste. The joists must be sound and stiff, so we check for any old leak damage and add noggins where the floor bounces.
On modern estates such as Kingsway and Quedgeley the ground floor is usually a concrete slab or beam-and-block. Recessing a tray into it means cutting the slab, which is possible but needs care around the damp-proof membrane and any pipes buried in the screed. Often the better answer is a very low-profile tray with a small step, or raising the whole floor slightly to create the fall.
Upstairs on newer homes, the floors are often engineered joists or chipboard decking, which have their own rules about how much can be cut. We check the type before we promise a fully level threshold.
What stops a Gloucester wet room leaking?
Proper waterproofing under the tiles, not the tiles themselves. We tank the whole floor and the walls to a sensible height with a membrane system, bed reinforcing tape into the corners and seal around every pipe that comes through. Only then does the tiling start.
We set the falls so water runs to a linear drain or a centre gully and does not pool by the door. Small mosaic or hexagon tiles follow a centre fall easily, while large-format tiles suit a linear drain with a single fall in one direction. A slate-effect wet room with an electric shower is one of the jobs in our gallery.
Check the joists or slab and decide the drain position
Fit the former or build the fall
Tank floor and walls, including corners and pipe entries
Tile with slip-resistant floor tiles and finish the screen
Before we build a wet room in a Gloucester home
In a Barton or Tredworth terrace, find out which way the back-addition joists run, since they often decide where the drain can go.
On a ground-floor slab in Abbeydale, Matson or Abbeymead, tell us anything you know about pipes buried in the screed.
On a Kingsway house, check the upstairs floor type in the builder's pack. Engineered joists limit how much we can cut.
Choose finishes with the city's moderately hard water in mind. Glass and dark tiles show scale quickly in a wet room.
In a converted Docks warehouse flat, ask the managing agent about waterproofing rules and access to the flat below.
Think about the route from the front door too. On Matson's hillside streets, outside steps may need a rail as well.
Step-free showers for older relatives in Gloucester terraces and estate homes
Many wet room enquiries come from families planning ahead for a parent. In a Victorian terrace in Kingsholm or Tredworth the bathroom is usually in the back addition over the kitchen, so the wet room sits on timber joists and the falls are built into a new deck. In a 1960s or 1970s house in Abbeydale or Matson, a downstairs wet room usually means cutting into a concrete slab.
Grab rails need solid fixings behind the tiles, a fold-down seat needs a reinforced wall, and the valve should be easy to reach while seated. Gloucester's water is moderately hard, so choose a valve whose cartridge can be reached and descaled, and a floor tile texture that does not trap a lime film. We plan all of these before the tanking goes on.
Moderately hard water still builds some scale over time, so we pick valves, screens and heating parts that cope with it and tell you how to keep them clear.
Building materials
Red brick, stone and stucco in the early nineteenth-century Spa and Brunswick Square, and timber-framed survivors such as the New Inn, a courtyard inn built around 1450.2
Timber frames and infill panels limit where pipes and fixings can go, so for a wet room in Gloucester we route around the frame and keep wet areas well sealed to protect old timber.
The town
A cathedral city on the River Severn with its historic docks at its heart, ringed by suburbs built over more than a century, from brick terraces near the centre to big estates at Quedgeley, Kingsway and Abbeymead.3
Older streets, steep or narrow access and parking all affect how a wet room is planned in Gloucester, so we look at access at the survey and build it into the timing and the written quote.
Word-for-word Checkatrade reviews from jobs in GL1 to GL4.
En-suite refit
Al and the team did a great job and were a great team. Not the quickest, mostly down to having lots of customers on the go which can be a bit frustrating from a selfish point of view but goes to show that they’re in demand which is a good sign!
GL4, GloucesterMarch 2026
fitting a new shower valve to a non standard set up
it was a fiddly job and I was impressed with the quality of the work.
GL2, GloucesterMarch 2026
Kitchen mixer tap installation.
Really good, was able to fit the tap and carried out further work to make sure everything was working smoothly.
Had approx 8m2 of floor tiles installed, hallway and downstairs bathroom. Job included removal and refitting of vanity unit and back to wall toilet and the install of a new heated towel rail. Very helpful, efficient and friendly company who completed the job over the weekend to fit in with our plans. Would definitely recommend.
Floor tilingGL3October 2025
Alastair was very helpful & was neat and tidy when work was carried out - would recommend 👍
Usually yes, but a fully level threshold may mean cutting into the slab, which takes care around the damp-proof membrane and any buried pipes. A low-profile tray or a slightly raised floor is often simpler. We look at the floor construction at the survey and explain the choices.
Not if it is tanked properly and the falls are right. We waterproof the whole floor and the wet zone of the walls before tiling, and test the drain before the room is finished. Most leaks in wet rooms come from skipped tanking or poorly sealed pipe entries.
Usually, yes. In the Victorian terraces of Barton, Tredworth and Kingsholm the bathroom is often over the kitchen in the back addition, on timber joists. That suits a wet room, because we can build the fall between the joists and drop the drain to the soil stack on the rear wall. We check the joist direction, any old leak damage and the stack position at the survey.
Timber or concrete is the first question. Timber floors let us fit a pre-formed former between the joists, while a slab needs cutting and screeding to falls. A back-addition bathroom in a Tredworth terrace may need joists strengthening and a wider door for level access. Every room is tanked and tested. Grab rails, a seat and slip-resistant tiles add to it, and moderately hard water makes an easy-clean drain worthwhile. You get a clear written quote once we have made a free site visit.
Free quotes & advice
Get a no-obligation quote and straight answers about your project. Whether it is a dripping tap, a cold radiator or a new bathroom, we will look at the job and tell you plainly what it needs.