Grey tiled shower area with a glass screen, a white tray, a thermostatic shower and a pedestal basin

Wet room installers in Cheltenham

Level-access wet rooms and walk-in showers in Cheltenham, built with proper tanking, falls and drainage on concrete or timber floors.

Listed on Checkatrade Member of the Association of Master Tradesmen Registered company 16784817 (opens in a new tab) Email photos of the job for a quote

The short answer

Most Cheltenham wet rooms CLA Developments builds start with someone finding the bath harder to step into, often in a Hesters Way or Up Hatherley house with a concrete floor, or upstairs in an older townhouse. Hard water means we choose drains and screens that are easy to keep clear. A free site visit and quote come first.

“Alistair did a great job refitting and tiling a bathroom for us.” Checkatrade review, GL52. More reviews

We are wet room installers in Cheltenham, and most of the wet rooms we build here start with someone who finds the bath side harder to step over each year. A customer in GL51 told us Alistair had done "an amazing job" on their dad's bathroom, "turning it into a shower". A good wet room is mostly invisible work: the floor laid to falls, every surface tanked, and a drain sized for the shower. We check your floor construction, waste route and water pressure at a free survey, then tell you honestly whether a full wet room or a low walk-in tray is the better fit.

Level-access showers on concrete floors in Hesters Way and Up Hatherley

Post-war houses on the west side of town, from the Hesters Way estate begun in the 1950s to the later streets of Up Hatherley and Warden Hill, usually have concrete ground floors, and a downstairs cloakroom can make a practical level-access shower room. On a slab, the fall to the drain is formed in a new screed, which may mean breaking out a channel for the waste. We check where the waste can join the drain outside before fixing the drain position.

In a Regency or Victorian house the ground floor is usually suspended timber over a void, sometimes with a basement below, so a ground-floor wet room there is built more like an upstairs one. A linear drain along the back wall gives a single fall, suits large-format tiles and is easier underfoot for someone with a frame; a centre gully needs falls from all four sides and smaller tiles.

Black thermostatic shower riser and black heated towel rail on marble-effect tiles, above a white tray

Tanking, tiling and the details that stop leaks

Every wet room we fit is tanked before tiling: a liquid or sheet membrane over the whole floor and up the walls, with reinforcing tape at every corner and collars round each pipe. We let it cure and check it before the tiles go on, because a missed joint here only shows up later as a stain on a ceiling or a damp skirting next door.

Slip resistance matters more than looks in a wet room. We help you choose floor tiles with a suitable grip and a grout that copes with constant wetting. Our floor tiling in Cheltenham uses the same preparation, and if you would rather keep a bath elsewhere in the house, our Cheltenham bathroom refits can plan the two rooms together.

  • Thermostatic shower valve set to a safe maximum temperature
  • Fold-down seat and grab rails fixed into solid backing
  • A screen or curtain to keep the rest of the room drier
  • A powerful extractor, since steam has nowhere else to go
  • Underfloor heating to dry the floor quickly between showers

Before we plan a wet room in Cheltenham

  • Tell us whether the room has a concrete floor or suspended timber.
  • Find where the soil pipe and outside drain run, and how deep the nearest inspection chamber is.
  • In a listed house, check whether the room has original floors or features that are protected.
  • Think about who will use the shower, and whether a seat and grab rails are needed now or later.
  • In a flat, check the lease and let the flat below know about the work.
  • Note the limescale on your taps; with water this hard, an easy-clean screen is worth having.

Can I have a wet room upstairs in an older Cheltenham house?

Often, as long as the timber floor can be dropped or built up for the falls. Upstairs in older Cheltenham houses the floor is usually timber, and the joist size and direction decide whether a sunken former is possible. Where it is not, a low-profile tray with a level threshold gives most of the benefit with far less disruption. Our guide to choosing a wet room or walk-in shower sets out the trade-offs, and you can read the full wet room process. See our Cheltenham work for the other trades we cover here, or level-access showers in Tewkesbury if you are further north.

Blue and navy metro tiles on a shower wall above a white tray, before the screen is fitted

Thinking about a level-access shower in Cheltenham? Call 07858 305739 and we will look at your floor and drain route at a free survey.

Free quote

Free quote for a wet room in Cheltenham

  • We reply within one working day, Monday to Friday, 9am to 5pm.
  • A free, no-obligation site visit.
  • A clear written quote before any work starts.

Prefer to talk it through? Call 07858 305739.

Tell us about the job

Two details and we'll call you back.

Enter your name

Enter a phone number we can call

No obligation. Prefer to talk? Call 07858 305739, Monday to Friday, 9am to 5pm.

We only use your details to reply about this job. Privacy.

Postcodes
GL50 to GL53
Council
Cheltenham Borough Council
County
Gloucestershire
Typical homes
Historic town centre, Victorian and Edwardian suburbs, later 20th-century housing
Our cover
Regular cover, including urgent call-outs
Local conditions

What affects a wet room in Cheltenham

The things about Cheltenham homes and ground that change how we plan and price this job, and what each one means for you.

Water hardness

Cheltenham's mains water is moderately hard to hard (about 194 mg/l as CaCO3 in Severn Trent's Cheltenham North supply zone and 201 mg/l in Cheltenham South).1

Hard water leaves scale on shower heads, screens, taps and boiler heat exchangers. For a wet room in Cheltenham we choose fittings that are easy to descale and recommend scale protection where it genuinely helps.

Building materials

Stucco over brick on early 19th-century terraces such as Rodney Terrace (about 1809 to 1820), with slate roofs, some of them mansard, and cast and wrought iron railings and balconies.2

Rendered and stuccoed brick hides what is behind it, so for a wet room in Cheltenham we check the wall before drilling or chasing and make good to match the finish.

The town

Historic spa town beside the Cotswolds that claims to be the most complete Regency town in Britain.3

Older streets, steep or narrow access and parking all affect how a wet room is planned in Cheltenham, so we look at access at the survey and build it into the timing and the written quote.

Checkatrade reviews

Reviews from customers in and around Cheltenham

Word-for-word Checkatrade reviews from jobs in GL50 to GL53, each with the postcode the work was in.

  • Heating and plumbing

    Great service, Alistair was friendly and pleasant and the job was completed to a high standard.

    GL50, CheltenhamJanuary 2026
  • Bathroom refit

    Alistair did a great job refitting and tiling a bathroom for us. The job was completed on time and Alistair even managed to fit in some additional small plumbing jobs which was really helpful. Alistair is straightforward and easy to work with.

    GL52January 2026
  • Toilet leak repair (clean water).

    Was able to repair quickly, when further issues developed came straight back and sorted. Left area clean, no parts left behind. Friendly, polite and professional.

    GL51, CheltenhamNovember 2025

Read more reviews See them on Checkatrade (opens in a new tab)

Shower room with green vertical wall tiles, a walk-in glass shower with a brass riser and patterned floor tiles
Real work, real customers

More reviews from customers in GL51 and GL52

Allistar has done an amazing job for my dad’s bathroom, turning it into a shower. He was reliable, professional and did a great job! Would recommend any day :) Thank you

ReliableGL51August 2025

Alistair fixed our staff toilet in the office and did a great job, everything was left very clean and tidy, and he was very efficient. Would highly recommend!

Would highly recommend!GL52July 2025

We’d been let down by other tradespeople so were really grateful when Alistair could come round and help us with a small plumbing job. Very friendly and prompt at replying - would certainly recommend

Friendly and prompt serviceGL52July 2025

CLA Developments Ltd was incorporated in October 2025. Reviews dated before then, and any that mention AJH Plumbing and Heating, are from jobs done by the same team under its earlier trading name.

Where we work

Wet rooms & walk-in showers across Cheltenham

We cover Cheltenham (GL50 to GL53) and the villages around it. Regular cover, including urgent call-outs.

    FAQ

    Wet rooms & walk-in showers in Cheltenham: questions answered

    Can't see yours? Call or email and you'll speak to the people doing the work.

    Often, if the room is big enough for a shower area and the waste can reach the drain with enough fall. On a concrete floor we form the fall in a new screed. Small rooms can still work with a careful layout and a screen. We measure the room and check the drain route at the survey.

    For many families it does. Level access removes the step over the bath, and a seat, grab rails and a thermostatic valve make showering safer. Ask about any assessment or support through your local council before work starts, as an occupational therapist's advice can shape the layout.

    Not if they are built properly. The whole floor and lower walls are tanked, falls take water to the drain and every pipe is sealed through the membrane. Leaks usually come from skipped tanking or poor falls, which is why we check both before tiling.

    Sometimes. A basement floor is usually solid and may sit below the drain outside, so the waste often needs a pumped unit, which suits a shower but needs power and access for servicing. Damp in the basement walls must be dealt with first. If the house is near the River Chelt, which flooded parts of town in 1979 and 2007, think carefully about where the pump and electrics sit.

    A downstairs cloakroom on a concrete floor in a post-war house needs the slab cutting for the drain and screeding to falls, and enlarging the room adds building work. Upstairs in a period townhouse, the joists decide whether a sunken former fits. Basements need extra attention to damp. Full tanking, slip-resistant tiles, grab rails and ventilation are part of every job, and hard water makes an easy-clean drain sensible. We set all of this out in a clear written quote after a free site visit.

    Free quotes & advice

    Get a no-obligation quote and straight answers about your project. Whether it is a dripping tap, a cold radiator or a new bathroom, we will look at the job and tell you plainly what it needs.

    Book a site visit
    Prefer to talk it through?07858 305739

    Lines open Monday to Friday, 9am to 5pm

    Connect with us 07858 305739 CLADevelopmentsltd@gmail.com Checkatrade reviews (opens in a new tab) Get in touch